My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02211977 Special Meeting
San-Marcos
>
City Clerk
>
01 City Council Minutes
>
1970 s
>
1977
>
02211977 Special Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2008 3:29:37 PM
Creation date
5/7/2008 10:59:34 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Minutes
City Clerk - Type
Special Meeting
Date
2/21/1977
Volume Book
46
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />-- <br /> <br />-, <br /> <br />URS/FORREST AND COTTONINC. - CONSULTING ENGINEERS <br /> <br />^ URS COMPANY <br /> <br />3607 MANOR ROAD I AUSTIN, TEXAS 78723 I (S12) 926-7700 <br /> <br />February 21, 1977 <br /> <br />Mr. James B. Baugh <br />Ci ty Manager . <br />City of San Marcos <br />P. O. Box 725 <br />San Marcos, Texas 78666 <br /> <br />Dear Mr. Baugh: <br /> <br />SUBJECT: City of San Marcos <br />2nd Year.Community Development Projects <br />Sunset Acres Orainage Extension <br />F & C File: 532-02-41 <br /> <br />We have completed our review of all of the bid documents submitted to <br />the City on or before 2:00 p.m., February 7, 1977. The two low bidders <br />were Joe McDaniel (1st) and Yantis Corporation (2nd). A copy of the bid <br />results is attached for your convenience. We have also completed our <br />investigative review of the contractors submitting the two lowest bids. <br />Copies of our investigative review sheets are also attached for your <br />convenience. <br /> <br />Based upon our investigation, we recommend that the City award a con- <br />tract to Joe McDaniel. The contract amount should be $464,380.00 if <br />Reinforced Concrete Pipe is desired, or $464,338.00 if asphalt-coated <br />Corrugated Metal Pipe is desired. Since both materials are acceptable <br />from an engineering standpoint, the selection of the construction <br />materi alto be util i zed, and the corresponding amount of contract away'd, <br />will be left to the discretion of the City. <br /> <br />We would like to advise you of one additional matter. Part of the Sun- <br />set Acres project ca 11 s for 379 L. F. of pi pe to be i nsta 11 ed by jacki ng, <br />tunneling, or boring. Joe McDaniel has advised us that he can install <br />the concrete pipe in the tunnels for less than' he can install the metal <br />pipe. Therefore, if metal pipe is selected for use, then Joe Mc Daniel <br />will request that he be allowed to install concrete pipe in the tunnels, <br />in lieu of metal pipe. This practice would also be perfectly acceptable <br />from an engineering standpoint. Joe McDaniel has advised us that he <br />will install the metal pipe/concrete pipe. tunnel combination for a price <br />
The URL can be used to link to this page
Your browser does not support the video tag.