Laserfiche WebLink
<br />C-(fy ,-:~cA.e~ <br />. - ,,~ <br />. CHANGE <br />ORDER <br />AlA DOCUMENT G701 <br /> <br />OWNER <br />ARCHITECT <br />CONTRACTOR <br />FIELD <br />OTHER <br /> <br />5J <br />5J <br />i\j <br />[J <br /> <br />PROJECT: Scheib Opportuni ty Center <br />(name, address) San Marcos, Texas <br /> <br />CHANGE ORDER NUMBER: <br /> <br />TO <br /> <br />(Contractor) <br /> <br />I Lamar Constructors <br />P. O. Box 3265 <br />San Antonio, Texas <br /> <br />78216 <br /> <br />general <br /> <br />"/ <br /> <br />ARCHITECT'S PROJECT NO: <br />CONTRACT FOR: <br /> <br />7730 <br /> <br />I <br /> <br />L <br /> <br />--.J CONTRACT DATE: <br /> <br />May 15, 1978 <br /> <br />You are directed to make the following changes in this Contract: <br /> <br />1. All labor and equipment Tequired for sitework (excluding the area covered by <br />the hili Iding) shall be provided by the Owner. This will include the following: <br />all demolition work and removal of existing trees, all required clearing and grubbing I <br />grading work and cut and fill work, installation of asphalt base and asphalt paving <br />and approaches. Material for sitework shall be provided by the Contractor as followsl <br />asphalt paving base, prime oil, asphalt, concrete, and wire mesh. <br /> <br />2. <br /> <br />Add concrete ramp, concrete walk, and masonry retaining wall at the exit on the <br />west end of the building as originally detailed and specified. (Delete Item 3, <br />Addendum No.6). <br /> <br />3. <br /> <br />Add the 2'-0" wide section through the bay between column lines 3 and 4 and <br />provide all required materials and finishes as originally detailed and specified, <br />(Delete Item 4, Addendum No.6). <br /> <br />4. <br /> <br />Add the masonry fireplace, all fireplace accessories, and the ,two single hung <br />windows as originally detailed and specified. (Delete Item 5, Addendum No.6). <br /> <br />5. <br /> <br />Add the aluminum and glass storefront framing at Secretary Rooms lID and 124. <br />(Delete Item 6, Addendum No.6). <br /> <br />I <br /> <br />(cont'd page 2) <br /> <br />The original Contract Sum was . . <br />Net change by previous Change Orders <br />The Contract Sum prior to this Change Order was. <br />The Contract Sum will be (increased) (Jj,,==lIidu(1d,~kby this Change Order, <br />The new Contract Sum including this Change Order will be . . . <br />The Contract Time will be OOll::r;~l(QjxtQJ:!i:'X=Jl) (unchanged) by <br />The Date of Completion as 01 the date of this Change Order therefore is February 25, 1979 <br /> <br />$ 229,361.00 <br />$ 0.00 <br />$ 229,361.00 <br />. $ 11,588.00 <br />$ 240,949.00 <br />( <br /> <br />) Days <br /> <br />Reh1er,Vaughn.Beaty & Koone,Inc. <br /> <br />8~R<N~IBE.CTLoop 410, Suite 180W <br />Address <br />San Antonio, Texas 78216 <br /> <br />Lamar Constructors <br />~~NtrAc~g~ 3265 <br />Address <br />San Antonio, Texas <br /> <br />78216 <br /> <br />City of San Marco~ Texas <br />OWNER <br />P. O. Box 725 <br />Ad'dress <br />San Marcos, Texas 78666 <br /> <br />~~(;l1 <br /> <br />DATE r....... :l71 1'i'lV <br /> <br /> <br /> <br />page I nf 3 <br /> <br />BY <br /> <br />BY <br /> <br />DATE <br /> <br />DATE <br /> <br />AlA DOCUMENT G7Dl . CHANGE ORDER . APRIL 1970 [DITION . AIA@ . @ 1970 . THE <br />IliMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C. 20006 <br />