Laserfiche WebLink
<br />3 <br /> <br />III <br /> <br />4 <br /> <br />5 <br /> <br />, <br /> <br />I <br /> <br />Add: <br />Following work shown on Sheet 42 of the Pla s on Project <br />No. PFL-TEX-2l1 & WS-TEX-Ol75. <br /> <br />Deductive Alternate No. 13 <br />Spring Lake Pumping Station <br /> <br /> <br />0,998.00 <br /> <br />INCREASE IN CONTRACT PRICE = $20,998.00 <br /> <br />Add: <br />Following work shown on Sheets 61, 62, 73 & 1+ of the Plans <br />on Project No.PFL-TEX-211 & WS-TEX-0175. <br /> <br />Deductive Alternate No. 16 <br />Westover Street Main <br /> <br />$ 2,549.60 <br /> <br />Delete: <br />Item No. 74 Asphaltic Pavement Replacement <br />Permanent 260 S.Y. @ $3.00 = $78 .00 <br /> <br />Item No. 76 Flexible Base Replacement <br />90 S.Y. @ $1.60 = $144.00 <br /> <br />INCREASE IN CONTRACT PRICE = $51,625.60 <br /> <br />Delete: <br />All pavement and flexible base replacement in original <br />contrac't and in Change Order No.1, on Projec PFL-TEX-211 <br />& WS-TEX-017S. <br /> <br />Original Contract: <br /> <br />a. <br /> <br />Water Supply & Distribution System <br /> <br /> Es Unit <br />Item No. Description Unit Q Price Total <br />25 Asphaltic Pavement S.Y. 721 $3.75 $27,037. 50 <br /> Replacement, <br /> Permanent <br />26 Asphaltic Pavement S.Y. 85 $2.00 $ 1,702.00 <br /> Replacement, <br /> Temporary <br />27 Flexible Base S.Y. 24- $2.00 $ 4-8.00 <br /> Replacement <br /> <br />