Laserfiche WebLink
<br />ENGINEER'S STATEMENT <br /> <br />The reasons for the changes listed in the attached Change <br />Order No. 2 are as follows: <br /> <br />Item No.1: Ellis St. Relief Main: Provide relief sewerage <br />line serviee. <br /> <br />Item No.2: Spring Lake Pumping Plant: Provide needed electrical <br />modifications to existing water pumping plant. <br /> <br />Item No.3: State Highway 123 Main: Provide needed water main <br />service. <br /> <br />Item No.4: Westover Sewer Main: Provide needed sewerage main <br />service. <br /> <br />Item No.5: Delete all Pavement and Flexible Base Replacement: <br />Deletion of pavement and flexible base replacement <br />will enable the City of San Marcos to provide <br />additional water and sewer lines for the City. <br />The pavement and flexible base replacement will be <br />done by City of San Marcos forees. <br /> <br />, <br /> <br />Item No.6: Price Differential for Changing Sewerage Lift <br />Station Wet Wells: Construction change to benefit <br />both Owner and Government. <br /> <br />fl ~ 'i~ ~~. <br /> <br />- <br /> <br />, <br /> <br /> <br />