Laserfiche WebLink
<br />Periodical Estimate No. 2 <br />Pro' ect: WATER l, SEI'SER EXTENS IONS & <br />Bid ITem 3 <br />I 2 <br />Description Uni <br /> <br />No. <br /> <br />I 10" YO Pipe 0'-6' L.F <br />2 10" Y.C, Pipe 6'-8' L.F <br />3 10" V.C, P1pe 8'-10' L,F <br />4 10" Y.C, Pipe 10'-/2' L,F <br />5 10" C.I. Pipe 8'-/0' L,F <br />6 10" C.t. Pipe 10'-12' L,F <br />76"C.I.Forcel\1Bin L.F <br />8 10" C.I. Pipe Bored or lllll <br />Jackod L,F <br />9 C.I. Pipo Fittings TON <br />10 Shal low Manholes O'-4'Ooe ~A. <br />I i Standard Manholes 4'-6'" EA. <br />12 Extra Depth to Manholes L.F <br />13 Connection of Force Main <br />to Surge Tank EA. <br />14 LittStation EA. <br />15 elt C,I. Water Main L.F <br />16 6" C,I. vl"tor Main L.F <br />17 CI F tt i ngs for 6" "nd <br />8" C.I. W"ter Main TOI, <br />IS 6" C,I; w"tor M"in in Cas <br />ing,borod or jacked <br />undor R.11. L.F <br />19 Cutting and Putching <br />Asphult Pavomont S.Y <br />20 [)" o"to Val Ve EA, <br />21 6" Outo Valvo EA. <br /> <br />-- <br /> <br />FRANK T. DROUGHT <br />Consulting Engineer <br />LI FT S TAT ION SAN j,1ARCOS TEXAS (27-i,U-20) <br />4 Work On ,ntities <br />Estimated 5 6 7 <br />Quantity This Through To <br />Estimate last i=st Date <br /> <br />/,590 <br />650 <br />370 <br />70 <br />190 <br />50 <br />520 <br /> <br />480 <br />0.20 <br />2 <br />9 <br />13 <br /> <br />I <br />I <br />1~50 <br />1,265 <br /> <br />0.40 <br /> <br />1,024 <br />978 <br />125 <br />NONE <br />NO[,E <br />NONE <br />501 <br /> <br />NONE <br />~lONE <br />NOliE <br />6 <br />5.99 <br /> <br />I <br />, <br />:1;342 <br />1,094 <br /> <br />0.472 <br /> <br />95 <br /> <br />14 <br />I <br />I <br /> <br />98./1 <br />I <br />I <br /> <br />340 <br />1M <br />228 <br />57 <br />303 <br />6 <br />NONE <br /> <br />446 <br />NOHE <br />',ONE <br />5 <br />7,13 ' <br /> <br />NONE <br />nONE <br />i ,NONE <br />NONE <br /> <br />NO/.IE <br /> <br />40 <br /> <br />NOI',E <br /> <br />NONE <br />I',ONE <br />NO:,E <br /> <br />1,364 <br />1,144 <br />353 <br />57 <br />303 <br />6 <br />501 <br /> <br />446 <br />N0i1E <br />NONE <br />II <br />13.12 <br /> <br />I <br />I <br />1,342 <br />1,094 <br /> <br />0,472 <br /> <br />98.1 [ <br />1 <br />i <br /> <br />8 <br />Unit <br />Bid <br />Price <br /> <br />13.00 <br />400.00 <br />90.00 <br />[00.00 <br />15.00 <br /> <br />85.00 <br />8, 139.00 <br />2'.92 <br />2.15 <br /> <br />400.00 <br /> <br />40 <br /> <br />14.00 <br /> <br />5,00 <br />130.00 <br />64,00 <br /> <br />Supplemental <br />Sheet No. 2 <br />9 <br />Total <br />Cost <br />To Oate <br /> <br />1,50 <br />1.70 <br />2.00 <br />3.00 <br />4,20 <br />4.50 <br />2.15 <br /> <br />2,046.00 <br />1,944,00 <br />706.00 <br />171.00 <br />1,272.60 , <br />27,00' <br />1,077.15 <br /> <br />5.798,00 <br />NONE <br />NONE <br />1,100.00 <br />/96,80 <br /> <br />85.00 <br />8,139,00 <br />3,918.64 <br />2,352.10 <br /> <br />188.80 <br /> <br />560,00, <br /> <br />490,55 <br />80,00 <br />64.00 <br /> <br />TOTAL 30,217.44 <br /> <br />.. <br /> <br />~ <br /> <br />of 2 <br />10 <br />Estimated <br />Total <br />Cost <br /> <br />2,385.00 <br />1,105.00 <br />740,00 <br />210.00 <br />798.00 <br />225.00 <br />[, /18.00 <br /> <br />6,240,00 <br />80.00 <br />[80,00 <br />900,00 <br />195,00 <br /> <br />85.00 <br />ll, /39.00 <br />3,942.00 <br />2,7/9.75 <br /> <br />160.00 <br /> <br />1,330.00 <br /> <br />70,00 <br />80.00 <br />64.00 <br /> <br />30,765.75 <br /> <br />Sheets <br />" <br />% <br />com- <br />lete <br /> <br />100 <br />100 <br />100 <br />100 <br />JOO <br />100 <br />100 <br /> <br />100 <br />100 <br />100 <br />100 <br />[00 <br /> <br />100 <br />100 <br />100 <br />100 <br /> <br />100 <br /> <br />100 <br /> <br />100 <br />100 <br />100 <br />