Laserfiche WebLink
<br />lJ1 <br /> <br />OBTA1N A BOOTH AT THE STATE FAIR OF TEXAS IN DALLAS <br />TO ADVERTISE OUR COMMUNI~Y. <br /> <br />EXTENO ALABAMA STREET TO INTERSECT WiTH ALEX STREET. <br /> <br />PAVE SARAH DRIVE TO TAKE CARE OF DRAINAGE PROBLEMS <br />THERE. <br /> <br />GIVE EVERY POSSIBLE ASSISTANCE TO THE SAN MARCOS <br />INDEPENOENT SCHOOL DISTRICT IN THEIR EFFORTS TO <br />OaTAIN FEDERAL AIO FOR THE CONSTRUCTION OF NEW <br />SCHOOL FACILITIES. <br /> <br />PAVE FREOERICKSaURG STREET BETWEEN HUTCHISON AND <br />GARRISON STREETS AS REQUESTED BY THE SAN MARCOS <br />INDEPENDENT SCHOOL DISTRICT. <br /> <br />EXPAND THE SIZE OF THE MUNICIPAL RECREATION BUILDING <br />ANO PROVIDE FACILITIES SUFFICIENT TO MEET THE RECENT <br />OEMANOS OF GROUPS USING SAIO BUILOING. <br /> <br />21. COOPERATE COMPLETELV WITH THE LOCALINOUSTRIAL <br />FOUNOATIONS I. THEIR EFFORTS TO OBTAIN INOUSTRIAL <br />GROWTH FOR OUR COMMUNITY. <br /> <br />22. CARRY OUT TRAFFIC CONTROL MEASURES AT THE INTERSEC_ <br />TION OF Loop g2 AND OLD AUSTIN HIGHWAY AS PER ~IGH_ <br />WAV DEPARTMENT SURVEY. <br /> <br />23. NEGOTIATE WITH THE STATE HIGHWAY DEPARTMENT FOR THE <br />EXTENSION OF HIGHWAY SO THROUGH SAN MARCOS TO RANCH <br />ROAD 12, WITH CONSTRUCTION OF HOPKINS STREET BRIOGE. <br /> <br />'I <br /> <br />24. REGRAOE ANO PAVE CHEATHAM STREET FROM GUAOALUPE <br />STREET TO THE SAN.MARCOS RIVER BRIDGE. <br /> <br />25. REGRAOE RAILROAD CROSSINGS ON AUSTIN ANO GUADALUPE <br />STREETS TO PROVIDE SMOOTHER CROSSINGS. <br /> <br />26. NEGOTIATE WITH THE STATE HIGHWAY DEPARTMENT FOR <br />HIGHWAV SIGNS INOICATING ROUTES TO CANYON OAM AND <br />SOUTH WEST TEXAS STATE COLLEGE. <br /> <br />THE CITY MANAGER IS REQUESTEO TO PRovlOE PROGRESS REPORTS <br />ON ALL PRIORITY PROJECTS AT EACH COUNCIL MEETING. <br /> <br />I <br />