My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2008-100
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2008
>
Res 2008-100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2008 3:43:12 PM
Creation date
8/4/2008 9:16:20 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2008-100
Date
7/15/2008
Volume Book
176
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
advise and consult with the City and provide progress reports and advice to the City in writing; <br />forward the City's instructions to the Contractor unless (1) Engineer is unavailable by telephonic <br />communication or otherwise to issue instructions necessary for the proper progress and <br />acceptance of work; (2) jeopardy to life and/or property exists; and/or (3) lack of instructions <br />and/or unavailability of Engineer will result in, in City's opinion, harm to City, in which case <br />instructions may be forwarded directly to the Contractor by the City; have authority to act on <br />behalf of the City only to the extent provided herein and in the construction contract documents <br />unless otherwise modified by written instrument in accordance with Section 12.1. Any <br />instructions issued directly by City to Contractor will be promptly communicated to the Engineer <br />if the Engineer was unavailable at the time of issuance of instructions. <br />1.5.14 Assist the City in conducting apre-construction conference with the Contractor, members <br />of City's staff, representatives of affected utility providers, and federal and state agencies having <br />jurisdiction over the Project (including City inspectors) in order to establish construction <br />schedules and to identify key representatives of the parties and lines of communication. <br />1.5.15 Assist the City in ensuring that all applicable permits and approvals have been obtained <br />from the appropriate agencies prior to construction. <br />1.5.16 Make on-site inspections of the Project at least weekly to ensure familiarity with the <br />progress and quality of the work, to determine if the work is proceeding in acceptable <br />conformance with the construction contract documents, and to review the work with the City's <br />designated representatives. On the basis of such on-site inspections by the Engineer, the <br />Engineer will keep the City informed of the progress and quality of the work through written <br />status reports and through meetings with the City's representative; and will also be reasonably <br />available to perform site visitations at the specific request of the City by the next business day <br />after a request is made. <br />1.5.17 Coordinate with the City's construction testing lab to manage testing and provide <br />QA/QC. <br />1.5.18 Not have control or charge of and will not be responsible for construction means, <br />methods, techniques, sequences or procedures, or for safety precautions and programs in <br />connection with the work, for the acts or omissions of the Contractor, subcontractors or any other <br />persons performing any of the work, or for the failure of any of them to carry out the work in <br />accordance with the construction contract documents unless such acts or omissions are due to the <br />negligence of the Engineer or are acts or omissions under the Engineer's control. However, <br />Engineer will exercise its authority on behalf of City in accordance herewith and particularly <br />during the construction phase so that all work performed by the Contractor results in a Project <br />completed in accordance with the construction contract documents, and during any phase should <br />the Engineer become aware of the Contractor's utilization of means, methods, techniques, <br />sequences and/or procedures of construction which, in Engineer's opinion, will not result in <br />completion of the Project in accordance with the construction contract documents; or which are <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.