My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08052008 Regular Meeting
San-Marcos
>
City Clerk
>
01 City Council Minutes
>
2000 s
>
2008
>
08052008 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2017 4:35:12 PM
Creation date
8/13/2008 8:24:26 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Minutes
City Clerk - Type
Regular Meeting
Date
8/5/2008
Volume Book
177
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
OWNER <br />PROJECT <br />PROPOSED CONTRACT MODIFICATION PCM <br />CITY OF SAN MARCOS, TEXAS PROJECT NO. <br />RIVERSIDE MKT INTERCEPTOR I OWNER <br />CONTRACTOR TEXAS STERLING CONSTRUCTION CO. CONTRACTOR <br />ENGINEER ALAN PLUMMER ASSOCIATES INC ENGINEER 0600-012-01 <br />DRAINAGE IMPROVEMENTS <br />PCM NO. 3 <br />NOTIFICATION TO CONTRACTOR: T <br />WE ARE CONSIDERING MAKING THE CHANGE TO THE CONTRACT DESCRIBED IN THE ATTACHED MATERIALS AND <br />REQUEST THAT YOU TAKE THE FOLLOWING ACTION: <br />? NOTIFY US THAT YOU CONCUR THAT THIS CHANGE DOES NOT REQUIRE A CHANGE IN CONTRACT TIME OR <br />AMOUNT. A FIELD ORDER WILL BE ISSUED. <br />El SUBMIT A PRICE PROPOSAL WITH DETAILED COST BREAKDOWN AND REVISED SCHEDULE FOR PERFORMING <br />THE DESCRIBED CHANGE. <br />® A CHANGE ORDER WILL BE ISSUED FOR PAYMENT AT THE UNIT PRICE BID. <br />1-1 PROCEED WITH THE CHANGE UNDER THE TIME AND MATERIALS PROVISION OF THE CONTRACT. <br />BY: James S. McMillen <br />DATE: 4/14/08 <br />CONTRACTOR'S RESPONSE: <br />WE RESPOND TO YOUR REQUEST AS FOLLOWS: <br />WE CONCUR THAT THIS IS A NO COST OR TIME CHANGE. ISSUE FIELD ORDER. <br />I-I WE SUBMIT THE ATTACHED PRICE PROPOSAL WITH DETAILED COST BREAKDOWN AND REVISED SCHEDULE <br />L_I FOR PERFORMING THE DESCRIBED CHANGE. TOTAL COST IS $ <br />® WE ARE PROC:EF N WITH THE CHANGE AT THE UNIT PRICE BID. <br />WE ARE PROCEED N WI THE CHANGE UNDER THE TIME AND MATERIALS PROVISION OF THE CONTRACT. <br />BY: <br />DATE: d ?8 6 <br />TION TAKEN: <br />El PROPOSED CONTRACT MODIFICATION REJECTED. CONTRACTOR NOTIFIED NOT TO PROCEED. <br />BY' DATE: <br />?L__J FIELD ORDER ISSUED: NO: DATE: BY: <br />L!!1 CHANGE ORDER ISSUED: NO: DATE: BY: <br />INSTRUCTIONS: <br />DRAINAGE IMPROVEMENTS SHALL BE INCLUDED IN THE CONTRACT PER C-050 AND WILL <br />INCLUDE THE ENTIRE SIDE CHANNELHOWN ON THE PLANS, TWO CONNECTIONS TO <br />SEWER TRENCH (STA. 81+00 AND STA. IN THE MAIN CHANNEL, AND PAVERS PER DETAIL <br />A FROM STA. 80+27 TO STA. 85+75 IN THE MAIN CHANNEL. THE IMPROVEMENTS WILL BE PAID <br />AT THE UNIT PRICE BID FOR THE SIDE CHANNEL, $1,488 PER TRENCH CONNECTION, AND $8/SF <br />FOR THE MAIN CHANNEL (PER ATTACHED EMAIL FROM DARREN OKRUHLIK ON 2/25/08). THESE <br />IMPROVEMENTS SHALL BE COMPLETED BETWEEN MAY 12 AND AUGUST 15, 2008. <br />M:\I'ro.jccts\0600\012-00\C'onstrAdtnin\Cc)nSItUCtlon Mod1f1-dons\PCM\PCM ()3\1'CM 03.doc
The URL can be used to link to this page
Your browser does not support the video tag.