My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08052008 Regular Meeting
San-Marcos
>
City Clerk
>
01 City Council Minutes
>
2000 s
>
2008
>
08052008 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2017 4:35:12 PM
Creation date
8/13/2008 8:24:26 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Minutes
City Clerk - Type
Regular Meeting
Date
8/5/2008
Volume Book
177
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CHANGE ORDER No. 1 <br />CITY OF SAN MARCOS, TEXAS <br />PROJECT: Riverside MKT Interceptor <br />CONTRACTOR: Texas Sterling Construction <br />ORIGINAL CONTRACT DATE: February 1, 2008 <br />CHANGE ORDER DATE: July 15, 2008 <br />WORK TO BE ADDED TO OR DELETED FROM SCOPE OF SERVICES <br />This Change Order constitutes full and mutual accord and satisfaction for all time and costs related to this particular change. <br />Drainage Improvements <br />1. Add drainage improvements per PCM 03 ($118;000). <br />a. Side Channel - 6200 SF at $10/SF = $62,000 <br />b. 2-Connections (STA. 81+00 and 85+75) to the WW trench in the Main Channel at <br />$1,488/connection = $2,976 <br />c. Pavers in the Main Channel - 6,628 SF at $8/SF = $53,024 (STA. 80+27 to <br />approximately STA. 85+75) <br />2. No change in contract time. <br />3. No additional payment will be made for work in excess of $118,000. <br />Extending Line to Post Road and Field Changes <br /> <br />Item Description Estimated Unit <br />Unit Cost Estimated Days <br /> Qty Cost Added <br />A. PCM 01 - Realignment near Riversid e Drive to avoid trees. <br />Bid Item 23 (4) LF $250 ($1,000.00) <br />Bid Item 24 8 LF $800 $6,400.00 0 <br /> Subtotal $5,400.00 0 <br />B. PCM 02-R - Modifications near the e xisting IH35 li ft station. <br />Controlled Low 10 CY $114 $1 <br />140.00 <br />Strength Material , <br />Bid Item 18 62 LF $130 $8,060.00 0 <br />Bid Item 25 1 EA $6,000 $6,000.00 <br />Bid Item 28 (1) EA $65,000 ($65,000.00) <br /> Subtotal ($49,800) 0 <br />C. PCM 04 - Added the Post Road Extension to the contract. <br />Bid Item 11 886 LF $2.30 $2,037.80 <br />Bid Item 22 742 LF $195 $144,690.00 <br />Bid Item 26 2 EA $9,000 $18,000.00 <br />Bid Item 27 11.5 VF $150 $1,725.00 15 <br />Bid Item 30 (price 213 LF $585 $124 <br />605.00 <br />increased) , <br />Bid Item 41 2,600 SY $3 $7,800.00 <br /> Subtotal $298,857.80 15
The URL can be used to link to this page
Your browser does not support the video tag.