Laserfiche WebLink
<br />INDEX, VOLUME 46 <br /> <br />(Bids cant'd) <br /> <br />cerretery Maintenance-Stanley C. Steman <br />$18,835 <br /> <br />Concrete & netal pipe-Fbrrest & Cotton <br />$492,200 <br /> <br />I <br /> <br />Curb & Gutter-Phonix Concrete Const. <br />$3.15 linear ft. <br /> <br />Dictating & Microfilriring Machine Equip. <br />IBM-$7,477.60-Eastman Kodack $16,428.35 <br /> <br />Fire Equiprent-Claude Wright & Assoc. <br />$3,765.25 <br /> <br />Garbage-Iear load Packer Unit-PAK-M)R <br />$3,990 <br /> <br />Pickup Truck (Street Dept) -Red Sinon <br />Fbrd $4334.41 <br /> <br />Portable Punp- Alarro Iron WOrks <br />$5,923.94 <br /> <br />Shuttle Bus System <br /> <br />I <br /> <br />Tractor- Jim winn WOrks $5673 <br /> <br />utilities Extension-Civic Center- C.M. <br />Construction Co. $62,149.17 <br /> <br />Wallace Addition Improverrents-DU MaR <br />Enterprises $406,275.01 <br /> <br />Water Meters-lbckv.e11 Interation <br />$23.54 <br /> <br />Blanco Terrace subdivision <br /> <br />Bluebonnet Area Improvements <br /> <br />I <br /> <br />.. <br />Board of Adjustrrents <br /> <br />Board of Equilization <br /> <br />Broadway Street project <br /> <br />Budget <br /> <br />Hi <br /> <br />176;182 <br /> <br />113 <br /> <br />176;182 <br /> <br />92;100 <br /> <br />87 <br /> <br />19 <br /> <br />215 <br /> <br />126; 127 <br /> <br />98 <br /> <br />206;212 <br /> <br />19 <br /> <br />19 <br /> <br />137;140 <br /> <br />143;187 <br /> <br />15;35 <br /> <br />41 <br /> <br />1;51 <br /> <br />65;27;~2;86;113;154 <br /> <br />78;82;97;99 <br />