Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />of land are not a part of this contract. The Owner <br />shall pay for costs of land surveys and shall compensate <br />the Engineer for services rendered in connection with <br />condemnation proceedings. <br /> <br />3., Compensation to Engineer: The Owner agrees to pay the <br />Engineer for all professional services rendered under this contract <br />in accordance with the following: <br /> <br />a. Step I Preliminary Engineering and Planning: The <br />Engineer shall be compensated a lump sum of One Hundred <br />Seven Thousand, Eighty Eight Oollars ($107,088) for <br />the services described in Section 2.a above. <br /> <br />b. Designs, Plans and Specifications: The compensation <br />for serV1ces 1n connect10n w1th furnishing Step II <br />design, plans and specifications as presented in Para- <br />graph 2.b shall be determined by mutual consent at <br />the time an application is submitted by the Owner <br />for Step II grant funds. <br /> <br />c. General Representation and Resident Representation <br />During Construction: The compensation for services <br />in connection with General Representation and Resident <br />Representation during construction, as presented in <br />Paragraph 2.c and 2.d, shall be determined by mutual <br />consent at the time an application is submitted by <br />the Owner for Step III, Construction, grant funds. <br /> <br />4. Time of Compensation: Payment for services rendered by <br />the Engineer shall be made as follows: <br /> <br />a. For Step I services the Engineer may submit requests <br />for partial payment monthly based on the amount of <br />work completed in each task set forth in the Plan <br />of Study of the grant application; however, the sum <br />total of these payments shall not exceed ninety (90%) <br />percent of the total fee or gO percent of any task <br />cost at the time of submittal of the Facility Plan <br />to the Owner. The final ten (10%) percent of the <br />fee shall be due and payable upon approval and certifi- <br />cation of the Facility Plan by the Texas Department <br />of Water Resources and the U.S. Environmental Protection <br />Agency. <br /> <br />b. For designs, plans and specifications for each item in <br />Paragraph 1, the Engineer may submit requests for <br /> <br />5. <br />