Laserfiche WebLink
<br />r <br /> <br />I <br /> <br />I <br /> <br />SUPPLEMENTAL ENGINEER AGREEMENT <br /> <br />STATE OF TEXAS <br />COUNTY OF HAYS <br /> <br />1 <br />1 <br /> <br />This supplemental engineer agreement is subsidiary and part of <br /> <br />the signed and executed engineer agreement of June 4, 1979 with the <br /> <br />City of San Marcos relating to CENTRE STREET RECONSTRUCTION PROJECT, <br /> <br />AND THE ROOSEVELT STREET/PATTON STREET PROJECT and containing the <br /> <br />addition of ARMSTRONG STREET AND ALABAMA STREET as a part of the <br /> <br />original paving preparation of plans, specifications and contract <br /> <br />documents. <br /> <br />The addition of this work will constitute two main changes, <br /> <br />(exception) from the original contract. <br /> <br />1. The City of San Marcos will acquire the final construction <br /> <br />staking (one time) services at no additional cost to the OWNER for the <br /> <br />added work (Alabama and Armstrong Streets) only. <br /> <br />2. The additional construction cost shall be added to the original <br /> <br />construction cost (that of the CENTRE STREET RECONSTRUCTION PROJECT, <br /> <br />AND THE ROOSEVELT STREET/PATTON STREET PROJECT for the pupose of <br /> <br />establishing the final engineering fee from the Standard TSPE-ASCE <br /> <br />1971 curVe. <br /> <br />All other sections of the June 4, 1979 shall remain current <br /> <br />This supplemental engineer agreement is offered only if accepted, <br /> <br />signed and responded by signing on or before a date prior to <br /> <br />December 17, 1979, 12:00 A.M. <br /> <br />CITY OF SAN MARCOS <br />OWNEJ}<j 1 ~ <br /> <br />BY: \>:uj~z 17 J?lUhb A'1 <br />Johu A. Hansen v <br />ij.yor <br /> <br /> <br />, INC. <br /> <br />BY: <br />S.A. <br /> <br />.~/ <br />