Laserfiche WebLink
<br />19 <br /> <br />DIVISION 2 <br /> <br />July 21, 1978 <br /> <br />I <br /> <br />The City of San Marcos <br />630 E. Hopkins <br />San Marcos, Texas 78666 <br /> <br />Attention: Mr. C. J. Webster, City Manager <br />Mr. Ray Kotowski, Director of Public Works <br /> <br />Gentlemen: <br /> <br />With regard to our numerous meetings and telephone conversations, we are <br />pleased to present you with a revised proposal for the Downtown Sidewalk <br />Renovation. <br /> <br />We will construct the project in accordance with plans and specifications <br />with changes and omitted items as described below for the sum of $137,790.00. <br />This is reducing the original bid from $265,790.00 -- a savings of $128,000.00 <br />from the original bid amount. <br /> <br />CHANGES AND OMITTED WORK: <br /> <br />I <br /> <br />A. LCRA has agreed to do the 'following work: <br /> <br />1. Pull the primary and secondary wire to the meter loops. <br /> <br />2. Install wiring for street lights. (Note: They were to furnish <br />the wire under the original bid.) <br /> <br />3. They also agreed to furnish the wire for the switchgear, and we <br />will install it. <br /> <br />If <br />....., <br /> <br />B. <br /> <br />Work supplied by the City: <br /> <br />1. Remove and relocate parking meters. <br /> <br />2. Provide pavement striping. <br /> <br />3. Provide and install planting soil and 2" mulch. <br /> <br />(Note: If the City desires us to do this work, the additional cost <br />would be $1,623.00, increasing the contract amount to <br />$139,413.00. ) <br /> <br />(continued) <br /> <br />0lVI610N 2 CONSTRUCTORS, INC, <br /> <br />10646 GUL.FOAL.E SUITE 1A <br /> <br />SANANTONIO,TEXAS 76216 <br /> <br />512/349-B062 <br />