Laserfiche WebLink
<br />VOLUME II <br />PLAN SUMMARY REPORT <br />GUADALUPE BASIN <br />WATER QUALITY MANAGEMENT PLAN <br /> <br />()~ <br />~A\ <br />>- <br /> <br />I <br /> <br />Developed to satisfy the requirements of Section 208 of <br />the Federal Water Pollution Control Act Amendments of 1972 <br /> <br />Pursuant to <br />Title 40 CRF 130 and 131 and <br />the State of Texas Continuing Planning Process <br /> <br />PREPARED IN COOPERATION <br /> <br />WITH THE <br /> <br />TEXAS DEPARTMENT OF WATER RESOURCES <br /> <br />The preparation of this report was financed through a <br />Planning Grant from the Texas Department of Water <br />Resources. <br /> <br />1- <br /> <br />Prepared by <br /> <br />URS!FORREST AND COTTON, INC. <br /> <br />AND <br /> <br />HYDROSCIENCE, INC. <br /> <br />FOR <br /> <br />THE GUADALUPE-BLANCO RIVER AUTHORITY <br /> <br />JUNE 1978 <br />