My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2004-080
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2004
>
Res 2004-080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2004 9:18:03 AM
Creation date
8/31/2004 12:33:23 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2004-80
Date
4/26/2004
Volume Book
155
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
138. <br /> <br /> ATTACHMENT B <br /> <br /> Scope of Services <br /> Kleinfelder Testing Services <br /> <br /> The Consultant will complete certain of the following tasks for each CIP Project as requested <br />by the City. The City will provide the Consultant with a written notice requesting services at least <br />five working days prior to the time professional testing services are required per City Project. <br /> <br /> In accordance with the terms of this Agreement, the Consultant will: <br /> <br />1.1 Compaction Testing <br /> <br />1.1.1 Implement an appropriate field monitoring and testing program to ensure that fill materials <br />are properly placed and compacted to include the following if requested by the City: <br /> <br /> a) percent compaction and soil moisture content requirements <br /> b) allowable fill/backfill materials <br /> c) testing frequency <br /> <br />1.1.2 Obtain sample(s) of proposed materials for laboratory evaluation. <br />1.1.3 Observe and document subgrade conditions prior to fill/backfill placement. <br />1.1.4 Observe and document proof-rolling operations. <br />1.1.5 Perform appropriate field testing to determine in-place moisture/density conditions. <br />1.1.6 Document field test locations. <br />1.1.7 Report test results to the City and to the Contractor's superintendent. <br /> <br />1.1.8 Re-test areas of failing moisture/density test results to document compliance with project <br />specifications. <br /> <br />1.2 Concrete Testing <br /> <br />1.2.1 Implement an appropriate field and laboratory testing program to confirm that the Portland <br />cement concrete provided is in conformance with project specifications, that it is properlyplaced and <br />that the results meet the specified design strength requirements to include: <br /> <br /> a) design strength/identification <br /> b) testing frequency <br /> c) placement requirements <br /> <br />Kleinfelder annual.wpd <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.