Laserfiche WebLink
<br />March, June or September); enter the ,1.mount shown for the <br /> <br />(section 8, above) and should cite reasons if the project <br /> <br />applicable period on page 1 of the contract. The planned <br /> <br />is behind schedule or over budget. Section C provides <br />the opportunity to identify problem's, needs, actions re- <br /> <br />claimed amount shall be computed from the planned expen- <br /> <br />diture using the reimbursement formula set forth in the <br /> <br />quired by OTS, and recommendations to OTS. Any (or all) <br /> <br />contract. <br /> <br />of the sections may be continued on separate sheets (in- <br />cluded as attachments). The' narrative section is an im- <br /> <br />7. ACCOUNTABLE ASSETS LIST - An accountable assets list is <br /> <br />required if, and only if, accountable assets have been <br /> <br />portant part of this report, and the project manager is <br />encouraged to mak~ effective use of this opportunity to <br /> <br />(physically) acquired during the reporting period. If <br />assets have been acquired, check the first block and <br /> <br />communicate needs, problems, achievements, and other <br /> <br />attach a copy of OTS form PR-7. If no assets ....ere ac- <br />quired during the reporting period, check the second block <br />and omit the PR-7 attachment. <br />8. SCHEDULE STATUS - List all milestones ....hich are scheduled <br /> <br />pertinent information. Please keep this narrative section <br /> <br />concise and interesting. Concentrate on major points <br /> <br />rather than details; include material of interest to other <br /> <br />project managers. <br /> <br />in the contract for completion on or before the end of the <br /> <br />10. PROJEC"l' ORGANIZATIOli CHART - An organization chart is re- <br /> <br />reporting period and ....hich have not been reported as com- <br />pleted in previous reports. Enter the milestone numb~r <br />(project start is milestone 01, the next milestone shown <br />in the contract is 02, etc; project complete is milestone <br />99), the milestone name (as sho....n in the contract), the <br />planned completion date (as sho....n in the contract), and the <br />actual completion date, if any. NOTE: always shOW' the <br />latest contract information (including all Contract Change <br /> <br />quired with the first project report. The form or format <br />is optional, but all key personnel, inclUding the project <br />manager, fiscal ~nager (or equal), evaluator (if any), <br />etc., must be shown by name and function. On subsequent <br /> <br />reports, the organization chart must be revised and re- <br /> <br />submitted if, and only if, one or more of the key personnel <br />change. . Check the applicable block and attach a revised <br />chart, if required. <br /> <br />Notices) . <br /> <br />ll.~ <br /> <br />9. NARRATIVE REPORT - The narrative report is divided into <br /> <br />three sections: Accomplishments, Problems Encountered, <br /> <br />A. CLAIMANT - Enter the name of the organization sub- <br />mitting the claim (this must be the organization shown <br />on the contract). <br /> <br />and Assistance Required. These sections may vary in con- <br />tent and detail as appropriate. Sections A , B must be <br />conai.tent with the report of milestones met and missed <br /> <br />B. AUTHORIZED SIGNATURE - The claim ~t be signed by a <br /> <br />Page 6 of 17 <br /> <br />Page 5 of 17 <br /> <br />- <br /> <br />- <br />