My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2010-071
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2010
>
Res 2010-071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2015 4:26:15 PM
Creation date
5/24/2010 11:05:54 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2010-71
Date
5/18/2010
Volume Book
186
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. 0285 -03 -042 <br />ct # 14 - Austin <br />Code Chart 64 # 37950 <br />Project: RM 12: Hughson St. to Holland St. <br />7. Environmental Assessment and Mitigation will be carried out as stated in the Master Agreement, _ <br />without exception. , <br />8. Compliance with Texas Accessibility Standards and ADA will be as stated in the Master <br />Agreement, without exception. <br />9. Architectural and Engineering Services will be provided by the Local Government, as stated in the <br />Master Agreement, without exception. The Local Government is responsible for performance of <br />any required architectural or preliminary engineering work. The design shall be in accordance <br />with the State Roadway Design Manual design criteria and the AASHTO Guide for the <br />Development of Bicycle Facilities. The State will review, comment and approve the work as <br />required to accomplish the public purposes of the Local Government. The State will cooperate <br />fully with the Local Government in accomplishing these local public purposes to the degree <br />permitted by State and Federal law. <br />10. Construction Responsibilities will be carried out by the Local Government. <br />11. Project Maintenance will be undertaken as provided for in the Master Agreement, without <br />exception. The Local Government shall be responsible for the maintenance of the project as <br />outlined in a separate Multiple Use Agreement. <br />12. Local Project Sources and Uses of Funds <br />a. Project Cost Estimate: A Project Cost Estimate is provided in Attachment C. Any work done <br />prior to federal authorization will not be eligible for reimbursement. It is the Local <br />Government's responsibility to verify with the State that the Federal Letter of Authority has <br />been issued for the work covered by this Agreement. <br />b. A Source of Funds estimate is also provided in Attachment C. Attachment C shows the <br />percentage and absolute dollar amount to be contributed to the project by federal, state, and <br />local sources. <br />c. The Local Government is responsible for all non - federal and non -state funding, including all <br />project cost overruns, unless otherwise provided for in this Agreement or through amendment <br />of this agreement. <br />d. Prior to the performance of any engineering review work by the State, the Local Government <br />will pay to the State the amount specified in Attachment C. At a minimum, this amount shall <br />equal the Local Government's funding share for the estimated cost of preliminary engineering <br />for the project. At least sixty (60) days prior to the date set for receipt of the construction bids, <br />the Local Government shall remit its remaining financial share for the State's estimated <br />construction oversight and construction costs. <br />e. In the event that the State determines that additional funding by the Local Government is <br />required at any time during the Project, the State will notify the Local Government in writing. <br />The Local Government shall make payment to the State within thirty (30) days from receipt of <br />the State's written notification. <br />f. Whenever funds are paid by the Local Government to the State under this Agreement, the <br />Local Government shall remit a check or warrant made payable to the' "Texas Department of <br />Transportation Trust Fund." The check or warrant shall be deposited by the State in an <br />escrow account to be managed by the State. Funds in the escrow account may only be <br />applied by the State to the Project. If, after final Project accounting, excess funds remain in <br />the escrow account, those funds may be applied by the State to the Local Government's <br />contractual obligations to the State under another advance funding agreement. <br />AFA- LPAFA_ShortGen.doc Page 2 of 7 Revised 05/02/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.