Laserfiche WebLink
Strategy Plan 9B LBJ Museum of San Marcos Floor Plans by Scott Jordan <br />t Bev. Exhibit Area Rest Rm. Rest Rm. Up <br />Lobby Up Elevator '10 (man) <br />MaintBna a (ladies) I.;, <br />Bev <br />Lma In _j <br />Collections cn <br />Exhibit Area <br />CIO. Office Gift Shop <br />Janitorial <br />13 (13 11 ('!Ihl,1­11� Eiectft El <br />approx. 122' <br />FIRST FLOOR Environmentally controlled Collections Storage on ground floor, near back entrance receiving area <br />Administrative space for work, study, lounge, etc. and Installed kitchenette <br />Phase /Mu Activity Room for temporary exhibits, meetings, classroom, etc. <br />Staff and Emergency Access must bm clear through-way <br />Strategy Plan 138 LBJ Museum of San Marcos Floor Plans by Scott Jordan <br />|� <br />|~� <br />" <br />t Exhibit Area Rest Rm. Rest Rm. U <br />Lobby Up Elevator 'ntana ce (ladies) (man) <br />Maintenance <br />L5 till <br />Exhibit Area <br />CIO. Office Gift Shop janitorial <br />13 13 <br />approx. 122' <br />FIRST FLOOR Environmentally controlled Collections Storage on ground floor, near back entrance receiving area <br />Curation room for work, study, lounge, etc. and installed kitchenette <br />Phase I/ Multi-purpose Activity Room for temporary exhibits, meetings, -classroom, etc. <br />Staff and Emergency Access must be clear through-way from both first and second floors <br />