Laserfiche WebLink
BLANCO VISTA RAILWAY OVERPASS <br />Summary of Costs as at May 16, 2008 <br />i. <br />:. <br />p9i20i2t30G <br />`Actual;. ^' <br />'Variance <br />. Description: ::,:.....:;A <br />`roved:8ud eE <br />.' To :. <br />Site Prep - S &G - <br />120,000.00 <br />291,000.00 <br />(171,000,00) <br />Site Prep - S &G - Erosion Cont <br />71,000.00 <br />127,977.60 <br />(56,977.60) <br />Sub Total Site Prep <br />191,000.00 <br />418,977.60 <br />(227,977.60) <br />Ug - Sntry Sewer- <br />50,000.00 <br />188,576.97 <br />(138,576.97) <br />Ug - Storm Sewer - <br />205,000.00 <br />269,280.00 <br />(64,280.00) <br />Ug - Water - <br />0,00 <br />70,005.00 <br />(70,005.00) <br />Sub Total Underground <br />255,000.00 <br />527,861.97 <br />(272,861.97) <br />Surface - Concrete - <br />4,850,000.00 <br />6,521,498.16 <br />(1,671,498.16) <br />Sub Total Surface <br />4,850,000.00 <br />6,521,498.16 <br />(1,671,498.16) <br />Cnsltng - Eng - <br />652,705.00 <br />861,531.02 <br />(208,826.02) <br />Cnsltng - Eng - Preliminary <br />130,000.00 <br />105,489.23 <br />24,510.77 <br />Cnsltng - Eng - Detailed <br />42,295.00 <br />44,825.00 <br />(2,530.00) <br />Cnsltng - Lgl Srvy - <br />37,050.00 <br />40,093.89 <br />(3,043.89) <br />Cnsltng - Landscape Architecture <br />6,000.00 <br />0.00 <br />6,000.00 <br />Cnsltng - Geo - Soils <br />125,000.00 <br />125,000.00 <br />0.00 <br />Sub Total Consulting <br />993,050.00 <br />1,176,939.14 <br />(183,889.14) <br />Mncpi Fee - ROW Acq <br />400,000.00 <br />247,833.69 <br />152,166.31 <br />Sub Total Municipal Fees <br />400,000.00 <br />247,833.69 <br />152,166.31 <br />Utlt - Elec - <br />500,000.00 <br />745,624.28 <br />(245,624.28) <br />Misc - Bonding - Subdivision <br />100,000.00 <br />53,766.00 <br />46,234.00 <br />Misc - Project Mob. <br />300,000.00 <br />800,000.00 <br />(500.000.00) <br />Misc - Lanscaping - Median <br />50,000.00 <br />0.00 <br />50.D00.00 <br />Misc - Traffic Control <br />55,000.00 <br />100,063.45 <br />(45,063.45) <br />Sub Total Miscellaneous <br />1,005,000.00 <br />1,699,453.73 <br />(694,453.73) <br />Contingency <br />146,067.00 <br />2,489.75 <br />143,577.25 <br />Sub Total Contingency <br />146,067.00 <br />2,489.75 <br />143,577.25 <br />At Grade crossing adjustment - $1,000,000.00 - 1,000,000.00 0 <br />Total Reimbursement per agreement $6,840,1 17.00 9,595,054.04 $2,754,937.04 <br />