Laserfiche WebLink
Rev:# D <br />Issue date:l0 /16/2002 <br />ENTERPRISE PRODUCTS OPERATING. LLC $ 330,646 1 Total This Tab <br />PROJECT TITLE: ENCROACHMENT: McCarty Lane - -30" Line # 177 Recoat & 20" Line 9033/1 Casing Extension <br />Project Cost Request # <br />Project ID # 0 <br />Size Description Quantity Units Unit Cost Cost Total Tax Total <br />Freight Allowance <br />368 <br />Is <br />Is <br />232.00 <br />- <br />- <br />- <br />- <br />MAINS: CONSTRUCTION CONTRACTOR [LABOR] <br />367 <br />EMPLOYEE EXPENSES. <br />0929 - <br />GO. LABOR - LMPLUS PAY SYSTEM <br />286 ,038 <br />Contractor Contractor Cost <br />1 <br />Is <br />200,000 <br />200,000 <br />200,000 <br />216,500 <br />Cathodic Ground Bed Installation Contractor Cost <br />1 <br />Is <br />40,000 <br />40.000 <br />40,000 <br />43,300 <br />Is <br />Is <br />Is <br />Is <br />Professional Engineering <br />100 <br />hr <br />100.00 <br />10,000 <br />10,000 <br />10,000 <br />Inspection Construction 1 man crew <br />14 <br />day <br />1,000.00 <br />14,000 <br />14,000 <br />15,155 <br />Riaht of Wnv Anent <br />t <br />Is <br />i nnn nn <br />t nnn <br />i nnn <br />i nRz <br />FIELD COMPRESSOR STATION EQUIPMENT <br />368 <br />FIELD MEASURING AND REGULATING STATION EQUIPMENT <br />369 <br />COMMUNICATION EQUIPMENT <br />370 <br />OTHER EQUIPMENT <br />371 <br />AFE SUBTOTAL 287,661 <br />EMPLOYEE EXPENSES. <br />0929 - <br />GO. LABOR - LMPLUS PAY SYSTEM <br />0927 7,200 <br />uramng 4u nr ru.uu z,auu z,auu z,suu <br />Construction 20 hr 100.00 2,000 2,000 2,000 <br />Engineering 10 hr 100.00 1,000 1,000 1,000 <br />Oneratnrc 9n hr 7n nn 'I Ann 7 Ann I Ann <br />MISC. PREPAYMENT DEPOSITS <br />0925 <br />AFUDC - CAPITALIZED'INT /DEBT (Projects Exceeding $1 MM Only) <br />0996 <br />AFUDC - CAPITALIZED INT /EQUITY (Projects Exceeding $1 MM Only) <br />0997 <br />MISC. USER DEFINED <br />0000 35,785 <br />IJ.VV %o A1,buu.0 <br />Contingency 1 10.00% 14,185 <br />THIS ESTIMATE IS PRELIMINARY AND IS NOT <br />INTENDED FOR CONSTRUCTION OR REIMBURSEMENT <br />AGREEMENTS. <br />McCarty Lane Prelim Estimate 2010- 05- 26.XLS <br />Printed: 5/27/2010 2:05 PM Page 1 of 1 Function T <br />