My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09022008 Regular Meeting
San-Marcos
>
City Clerk
>
01 City Council Minutes
>
2000 s
>
2008
>
09022008 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2017 4:36:37 PM
Creation date
9/9/2008 4:41:52 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Minutes
City Clerk - Type
Regular Meeting
Date
9/2/2008
Volume Book
177
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AUTHORIZATION OF CHANGE IN SERVICES <br />CITY OF SAN MARCOS, TEXAS <br />PROJECT: Waste Water Treatment Plant Wet Weather <br />Improvements Project <br />CONSULTANT: CH2M Hill, Inc. <br />AUTHORIZATION NO: 1 <br />ORIGINAL CONTRACT DATE: November 5, 2007 <br />DATE OF CHANGE: 01 - 0 2- 2-o O v <br />WORK TO BE ADDED TO OR DELETED FROM SCOPE OF SERVICES <br />This authorization is requested in order to include additional project management, design and <br />construction services associated with the following design elements: <br />1. Replacement of existing low pressure low intensity ultraviolet (uv) disinfection system <br />with a new low pressure high intensity uv system that is capable of treating peak 2-hour <br />flow rates (31 mgd). <br />2. Modification of the existing reaeration basin to provide for minimum effluent dissolved <br />oxygen concentrations of 6 mg/L during peak 2-hour flow rates. <br />3. Replacement of existing effluent flow meter. <br />4. Addition of polymer system as part of Chemical Enhanced Primary Treatment. <br />5. Modification of existing ferric chloride system as required as part of Chemical Enhanced <br />Primary Treatment. <br />Additional services to be provided under this authorization will not exceed $129,400 without <br />prior approval. Compensation will be provided on a fixed fee basis. <br />CH2M HILL requests that the contract for the above-referenced Project be revised to reflect the <br />following changes to Tasks listed in Article 15 Basis of Compensation. <br />Current amount <br />Task 1-Project Management $72,900.00 <br />Task 3-Preliminary Design $166,000.00 <br />Task 4-Final Design $185,600.00 <br />Task 6-Construction Management $364,700.00 <br />Revised amount <br />Task 1-Project Management $83,500.00 <br />Task 3-Preliminary Design $206,680.00 <br />Task 4-Final Design $235,320.00 <br />Task 6-Construction Management $393,100.00 <br />No changes to Task 2 Assessments or Task 5 Bid and Award Services are requested. <br />Wet Weather Improvements Project - CH2M Hill <br />1
The URL can be used to link to this page
Your browser does not support the video tag.