Laserfiche WebLink
CITY OF SAN MARCOS <br />PROJECT NAME: PARKER DRIVE DRAINAGE PROJECT <br />PROJECT NO. <br />CITY BID ITEM <br />UNIT OF APPROX <br />ITEM NO. 1 BID ITEM DFSCRTPTT01N MFASITRF DTIANTTTIFS <br />1015 -C <br />Preparing Right of Way (7 %) <br />Lump Sum <br />1 <br />1325 -A <br />Embankment <br />Cubic Yard <br />5 <br />4015 -A <br />Unclassified Structural Excavation and Backfil <br />Cubic Yard -Plan <br />Quantity <br />137 <br />4035 -CY <br />Class "A" Concrete - Rectangular Channel <br />Cubic Yard <br />53 <br />4065 -RC <br />Reinforcing Steel <br />Pound <br />4,280 <br />4335 <br />1P.C. Concrete Driveway <br />Square Foot <br />241 <br />506 JSW <br />Junction Box 4 Ft x 4 Ft <br />Each <br />2 <br />5085 -IA3 <br />Inlet, Area (3 ft x 3 ft) box <br />Each <br />1 <br />5085 -IA3 <br />Steel Grate (4 ft x 3.5 ft) <br />Each <br />1 <br />5095 -1 <br />Trench Excavation Safety Protective Systems <br />Lineal Foot <br />395 <br />510 -A- <br />2 4 SW <br />Reinforced Concrete Pipe, 24' 7a <br />depths), including excavation and backfill <br />Lineal Foot <br />376 <br />510- <br />BWW <br />Installing or Reconnecting Lateral Service to <br />Existing or Replaced Pipe (4 in Dia. PVC <br />Each <br />6 <br />6285 -C <br />Filter Curb Inlet Protection (New Inlet) <br />Each <br />1 <br />6025 -A <br />Bermuda Block Sodding <br />Square Yard <br />160 <br />6425 <br />Silt Fence for Erosion Control <br />Lineal Foot <br />828 <br />7005 -TM <br />Total Mobilization Payment (8 %) <br />Lump Sum <br />1 <br />8025 -B <br />Project Sign <br />Each <br />2 <br />803 -WD <br />Barricades, Signs and Traffic Handling (3 %) <br />Working Day <br />90 <br />KIVA, INC. <br />%UNIT BID PRICE _ AMOUNT 1 <br />$3,000.00 $3,000.00 <br />$2500 $125.00 <br />$25.00 $3,425.00 <br />$630.00 $33,390.00 <br />$0.60 $2,568.00 <br />$10.00 <br />$2,410.00 <br />$9.00 <br />$3,000.00 <br />$6,000.00 <br />$1,242.00 <br />$2,500.00 <br />$2,500.00 <br />$500.00 <br />$1,500.00 <br />$1,500.00 <br />$90.00 <br />$1.00 <br />$395.00 <br />$2.50 <br />SMITH CONTRACTING CO., INC. <br />UNIT BID PRICE AMOUNT <br />----------- ----- <br />$2,500.00 $2,500.00 <br />$35.00 $175.00 <br />$22.00 $3,014.00 <br />$400.00 $21,200.00 <br />$2.00 $8,560.00 <br />$8.00 $1,928.00 <br />$3,000.00 $6,000.00 <br />$2,500.00 $2,500.00 <br />$2,500.00 $2,500.00 <br />$1.00 $395.00 <br />$75.00 $28,200.00 $100.00 $37,600.00 <br />$200.00 $1,200.00 <br />$150.00 <br />$150.00 <br />$9.00 <br />$1,440.00 <br />$1.50 <br />$1,242.00 <br />$3,000.00 <br />$3,000.00 <br />$500.00 <br />$1,000.00 <br />$1.00 <br />$90.00 <br />$1,400.00 <br />$8,400.00 <br />$8.50 <br />$100.00 <br />$100.00 <br />$1,656.00 <br />$5.00 <br />$800.00 <br />$500.00 <br />$2.00 <br />$1,656.00 <br />$3,865.50 <br />$5,000.00 <br />$5,000.00 <br />$2.50 <br />$400.00 <br />$800.00 <br />$25.00 <br />$2,250.00 <br />SUBTOTAL: $91,635.00 <br />SUBTOTAL: $105,378.00 <br />LONGLEY CONSTRUCTION <br />,UNIT - BID PRICE! AMOUNT <br />- - ------------------ <br />$15,000.00 $15,000.00 <br />$27.50 $137.50 <br />$18.97 $2,598.89 <br />$618.27 $32,768.31 <br />$1.28 $5,478.40 <br />$7.89 $1,901.49 <br />$3,306.67 $6,613.34 <br />$2,132.55 $2,132.55 <br />$2,716.94 $2,716.94 <br />$1.00 $395.00 <br />$65.00. � y,J <br />$628.75 $3,772.50 <br />$100.00 <br />$100.00 <br />$8.50 <br />$1,360.00 <br />$2.00 <br />$1,656.00 <br />$1,660.00 <br />$1,660.00 <br />$500.00 <br />$1,000.00 <br />$42.95 <br />$3,865.50 <br />SUBTOTAL: - ri- StOt6 " <br />RELMCO, INC. <br />1_UNIT__13IDPRICE� _ AMOUNT <br />$7,500.00 $7,500.00 <br />$100.00 $500.00 <br />$30.00 $4,110.00 <br />$500.00 $26,500.00 <br />$1.00 $4,280.00 <br />$10.00 <br />$2,41000 <br />$3,500.00 <br />$7,000.00 <br />$4,500.00 <br />$4,500.00 <br />$4,000.00 <br />$4,000.00 <br />$7.00 <br />$2,765.00 <br />$64.00 $24,064.00 <br />$500.00 $3,000.00 <br />$93.50$93.50 <br />$4,932.00 <br />$4.24 ,: <br />_ 11 :+{Q <br />$2.48 __, <br />_jp�llft4 <br />$15,000.00 <br />$15,000.00 <br />$500.00 <br />$1,000.00 <br />$85.00 <br />$7,650.00 <br />SUBTOTAL: x{17 <br />MYERS CONCRETE CONSTRU <br />, UNIT BID PRICES T MO <br />AUN <br />A - UN <br />$2,180.00 $2,180.00 <br />$108.00 $540.00 <br />$36.00 <br />$4,932.00 <br />$323.00 <br />$17,119.00 <br />$1.00 <br />$4,280.00 <br />$7.80 <br />$1,879.80 <br />$3,545.00 <br />$7,090.00 <br />$2,280.00 <br />$2,280.00 <br />$747.00 <br />$747.00 <br />$2.50 <br />$987.50 <br />$160.00 $60,160.00 <br />$1,275.00 <br />$7,650.00 <br />$133.00 <br />$133.00 <br />$5.85 <br />$936.00 <br />$2.60 <br />$2,152.80 <br />$1,875.00 <br />$1,875.00 <br />$1,020.00 <br />$2,040.00 <br />$63.20 <br />$5,688.00 <br />SUBTOTAL: $122,670.10 <br />AUSTIN ENGINEERING CO., INf <br />UNIT BID PRICE] A MOUNT - - - - -- <br />------ - - - - -- <br />$20,000.00 $20,000.00 <br />$85.00 $425.00 <br />$2000 <br />$2,740.00 <br />$720.00 <br />$38,160.00 <br />$0.40 <br />$1,712.00 <br />$12.00 <br />$2,892.00 <br />$4,800.00 <br />$9,600.00 <br />$2,500.00 <br />$2,500.00 <br />$3,100.00 <br />$3,100.00 <br />$500 <br />$1,975.00 <br />FUQUAY, INC. <br />UNIT BID PRICE _ AMOUNT <br />- - - -' <br />$3,700.00 $3,700.00 <br />$300.00 $1,500.00 <br />$105.00 $14,385.00 <br />$727.00 <br />$38,531.00 <br />$385.00 $20,405.00 <br />$1.05 <br />$1.50 <br />$6,420.00 <br />$4,400.00 <br />$11.00 <br />$2,651.00 <br />$3,300.00 <br />$6,555.00 <br />$13,110.00 <br />$2.20 <br />$3,770.00 <br />$3,770.00 <br />$1,500.00 <br />$1,500.00 <br />$8.00 <br />$3,160.00 <br />G & P CONTRACTORS, INC. <br />UNIT BID PRICE _ AMOUNT <br />$22,000.00 $22,000.00 <br />$121.00 $605.00 <br />$148.50 <br />$20,344.50 <br />$385.00 $20,405.00 <br />$1.05 <br />$6.88 <br />$2.00 <br />$4,400.00 <br />$8,800.00 <br />$3,300.00 <br />$3,300.00 <br />$2,200.00 <br />$2,200.00 <br />$2.20 <br />$869.00 <br />$75.00 $28,200.00 $110.00 $41,360.00 $104.50 $39,292.00 <br />$850.00 $5,100.00 <br />$500.00 $3,000.00 <br />$1,100.00 $6,60000 <br />$150.00 <br />$150.00 <br />$6.00 <br />$960.00 <br />$2.00 <br />$1,656.00 <br />$14,150.00 <br />$14,150.00 <br />$500.00 <br />$1,000.00 <br />$80.00 <br />$7,200.00 <br />SUBTOTAL: $141,520.00 <br />$220.00 <br />$220.00 <br />$4.30 <br />$688.00 <br />$2.00 <br />$1,656.00 <br />$5,600.00 <br />$5,600.00 <br />$1,290.00 <br />$2,580.00 <br />$175.00 <br />$15,750.00 <br />SUBTOTAL: $159,58100 <br />$104.50 $104.50 <br />$11.00 $1,760.00 <br />$2.20 $1,821.60 <br />$16,500.00 $16,500.00 <br />$550.00 $1,100.00 <br />$110.00 $9,900.00 <br />SUBTOTAL: <br />