CITY OF SAN MARCOS
<br />PROJECT NAME: PARKER DRIVE DRAINAGE PROJECT
<br />PROJECT NO.
<br />CITY BID ITEM
<br />UNIT OF APPROX
<br />ITEM NO. 1 BID ITEM DFSCRTPTT01N MFASITRF DTIANTTTIFS
<br />1015 -C
<br />Preparing Right of Way (7 %)
<br />Lump Sum
<br />1
<br />1325 -A
<br />Embankment
<br />Cubic Yard
<br />5
<br />4015 -A
<br />Unclassified Structural Excavation and Backfil
<br />Cubic Yard -Plan
<br />Quantity
<br />137
<br />4035 -CY
<br />Class "A" Concrete - Rectangular Channel
<br />Cubic Yard
<br />53
<br />4065 -RC
<br />Reinforcing Steel
<br />Pound
<br />4,280
<br />4335
<br />1P.C. Concrete Driveway
<br />Square Foot
<br />241
<br />506 JSW
<br />Junction Box 4 Ft x 4 Ft
<br />Each
<br />2
<br />5085 -IA3
<br />Inlet, Area (3 ft x 3 ft) box
<br />Each
<br />1
<br />5085 -IA3
<br />Steel Grate (4 ft x 3.5 ft)
<br />Each
<br />1
<br />5095 -1
<br />Trench Excavation Safety Protective Systems
<br />Lineal Foot
<br />395
<br />510 -A-
<br />2 4 SW
<br />Reinforced Concrete Pipe, 24' 7a
<br />depths), including excavation and backfill
<br />Lineal Foot
<br />376
<br />510-
<br />BWW
<br />Installing or Reconnecting Lateral Service to
<br />Existing or Replaced Pipe (4 in Dia. PVC
<br />Each
<br />6
<br />6285 -C
<br />Filter Curb Inlet Protection (New Inlet)
<br />Each
<br />1
<br />6025 -A
<br />Bermuda Block Sodding
<br />Square Yard
<br />160
<br />6425
<br />Silt Fence for Erosion Control
<br />Lineal Foot
<br />828
<br />7005 -TM
<br />Total Mobilization Payment (8 %)
<br />Lump Sum
<br />1
<br />8025 -B
<br />Project Sign
<br />Each
<br />2
<br />803 -WD
<br />Barricades, Signs and Traffic Handling (3 %)
<br />Working Day
<br />90
<br />KIVA, INC.
<br />%UNIT BID PRICE _ AMOUNT 1
<br />$3,000.00 $3,000.00
<br />$2500 $125.00
<br />$25.00 $3,425.00
<br />$630.00 $33,390.00
<br />$0.60 $2,568.00
<br />$10.00
<br />$2,410.00
<br />$9.00
<br />$3,000.00
<br />$6,000.00
<br />$1,242.00
<br />$2,500.00
<br />$2,500.00
<br />$500.00
<br />$1,500.00
<br />$1,500.00
<br />$90.00
<br />$1.00
<br />$395.00
<br />$2.50
<br />SMITH CONTRACTING CO., INC.
<br />UNIT BID PRICE AMOUNT
<br />----------- -----
<br />$2,500.00 $2,500.00
<br />$35.00 $175.00
<br />$22.00 $3,014.00
<br />$400.00 $21,200.00
<br />$2.00 $8,560.00
<br />$8.00 $1,928.00
<br />$3,000.00 $6,000.00
<br />$2,500.00 $2,500.00
<br />$2,500.00 $2,500.00
<br />$1.00 $395.00
<br />$75.00 $28,200.00 $100.00 $37,600.00
<br />$200.00 $1,200.00
<br />$150.00
<br />$150.00
<br />$9.00
<br />$1,440.00
<br />$1.50
<br />$1,242.00
<br />$3,000.00
<br />$3,000.00
<br />$500.00
<br />$1,000.00
<br />$1.00
<br />$90.00
<br />$1,400.00
<br />$8,400.00
<br />$8.50
<br />$100.00
<br />$100.00
<br />$1,656.00
<br />$5.00
<br />$800.00
<br />$500.00
<br />$2.00
<br />$1,656.00
<br />$3,865.50
<br />$5,000.00
<br />$5,000.00
<br />$2.50
<br />$400.00
<br />$800.00
<br />$25.00
<br />$2,250.00
<br />SUBTOTAL: $91,635.00
<br />SUBTOTAL: $105,378.00
<br />LONGLEY CONSTRUCTION
<br />,UNIT - BID PRICE! AMOUNT
<br />- - ------------------
<br />$15,000.00 $15,000.00
<br />$27.50 $137.50
<br />$18.97 $2,598.89
<br />$618.27 $32,768.31
<br />$1.28 $5,478.40
<br />$7.89 $1,901.49
<br />$3,306.67 $6,613.34
<br />$2,132.55 $2,132.55
<br />$2,716.94 $2,716.94
<br />$1.00 $395.00
<br />$65.00. � y,J
<br />$628.75 $3,772.50
<br />$100.00
<br />$100.00
<br />$8.50
<br />$1,360.00
<br />$2.00
<br />$1,656.00
<br />$1,660.00
<br />$1,660.00
<br />$500.00
<br />$1,000.00
<br />$42.95
<br />$3,865.50
<br />SUBTOTAL: - ri- StOt6 "
<br />RELMCO, INC.
<br />1_UNIT__13IDPRICE� _ AMOUNT
<br />$7,500.00 $7,500.00
<br />$100.00 $500.00
<br />$30.00 $4,110.00
<br />$500.00 $26,500.00
<br />$1.00 $4,280.00
<br />$10.00
<br />$2,41000
<br />$3,500.00
<br />$7,000.00
<br />$4,500.00
<br />$4,500.00
<br />$4,000.00
<br />$4,000.00
<br />$7.00
<br />$2,765.00
<br />$64.00 $24,064.00
<br />$500.00 $3,000.00
<br />$93.50$93.50
<br />$4,932.00
<br />$4.24 ,:
<br />_ 11 :+{Q
<br />$2.48 __,
<br />_jp�llft4
<br />$15,000.00
<br />$15,000.00
<br />$500.00
<br />$1,000.00
<br />$85.00
<br />$7,650.00
<br />SUBTOTAL: x{17
<br />MYERS CONCRETE CONSTRU
<br />, UNIT BID PRICES T MO
<br />AUN
<br />A - UN
<br />$2,180.00 $2,180.00
<br />$108.00 $540.00
<br />$36.00
<br />$4,932.00
<br />$323.00
<br />$17,119.00
<br />$1.00
<br />$4,280.00
<br />$7.80
<br />$1,879.80
<br />$3,545.00
<br />$7,090.00
<br />$2,280.00
<br />$2,280.00
<br />$747.00
<br />$747.00
<br />$2.50
<br />$987.50
<br />$160.00 $60,160.00
<br />$1,275.00
<br />$7,650.00
<br />$133.00
<br />$133.00
<br />$5.85
<br />$936.00
<br />$2.60
<br />$2,152.80
<br />$1,875.00
<br />$1,875.00
<br />$1,020.00
<br />$2,040.00
<br />$63.20
<br />$5,688.00
<br />SUBTOTAL: $122,670.10
<br />AUSTIN ENGINEERING CO., INf
<br />UNIT BID PRICE] A MOUNT - - - - --
<br />------ - - - - --
<br />$20,000.00 $20,000.00
<br />$85.00 $425.00
<br />$2000
<br />$2,740.00
<br />$720.00
<br />$38,160.00
<br />$0.40
<br />$1,712.00
<br />$12.00
<br />$2,892.00
<br />$4,800.00
<br />$9,600.00
<br />$2,500.00
<br />$2,500.00
<br />$3,100.00
<br />$3,100.00
<br />$500
<br />$1,975.00
<br />FUQUAY, INC.
<br />UNIT BID PRICE _ AMOUNT
<br />- - - -'
<br />$3,700.00 $3,700.00
<br />$300.00 $1,500.00
<br />$105.00 $14,385.00
<br />$727.00
<br />$38,531.00
<br />$385.00 $20,405.00
<br />$1.05
<br />$1.50
<br />$6,420.00
<br />$4,400.00
<br />$11.00
<br />$2,651.00
<br />$3,300.00
<br />$6,555.00
<br />$13,110.00
<br />$2.20
<br />$3,770.00
<br />$3,770.00
<br />$1,500.00
<br />$1,500.00
<br />$8.00
<br />$3,160.00
<br />G & P CONTRACTORS, INC.
<br />UNIT BID PRICE _ AMOUNT
<br />$22,000.00 $22,000.00
<br />$121.00 $605.00
<br />$148.50
<br />$20,344.50
<br />$385.00 $20,405.00
<br />$1.05
<br />$6.88
<br />$2.00
<br />$4,400.00
<br />$8,800.00
<br />$3,300.00
<br />$3,300.00
<br />$2,200.00
<br />$2,200.00
<br />$2.20
<br />$869.00
<br />$75.00 $28,200.00 $110.00 $41,360.00 $104.50 $39,292.00
<br />$850.00 $5,100.00
<br />$500.00 $3,000.00
<br />$1,100.00 $6,60000
<br />$150.00
<br />$150.00
<br />$6.00
<br />$960.00
<br />$2.00
<br />$1,656.00
<br />$14,150.00
<br />$14,150.00
<br />$500.00
<br />$1,000.00
<br />$80.00
<br />$7,200.00
<br />SUBTOTAL: $141,520.00
<br />$220.00
<br />$220.00
<br />$4.30
<br />$688.00
<br />$2.00
<br />$1,656.00
<br />$5,600.00
<br />$5,600.00
<br />$1,290.00
<br />$2,580.00
<br />$175.00
<br />$15,750.00
<br />SUBTOTAL: $159,58100
<br />$104.50 $104.50
<br />$11.00 $1,760.00
<br />$2.20 $1,821.60
<br />$16,500.00 $16,500.00
<br />$550.00 $1,100.00
<br />$110.00 $9,900.00
<br />SUBTOTAL:
<br />
|