My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2008-161
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2008
>
Res 2008-161
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2009 8:38:22 AM
Creation date
12/4/2008 9:02:00 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2008-161
Date
12/2/2008
Volume Book
178
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Engineer will meet with City representatives at mutually convenient times to assemble this data <br />and information. <br />1.1 TASK 1 -PRELIMINARY ENGINEERING <br />The Engineer will: <br />1.1.1 Assemble a Project team comprised of the City's representatives and the Engineer's <br />representatives. The Engineer will meet with the Project team to set the design and production <br />schedule and parameters for all subsequent work, to verify the components within which all <br />Project participants must perform, and to identify all parties and significant deadlines involved in <br />the comprehensive schedule strategy. Based on this information, the Engineer will prepare a <br />detailed schedule of its work for the Project addressing each component of the work to be done, <br />indicating the points of involvement of all project participants. The Engineer will conduct <br />weekly progress meetings between the Project team and the Contractor once the construction <br />contract is executed. <br />1.1.2 Data Gatheriniz. Obtain and review record documents (e.g., existing rights-of-way, <br />utilities and other improvements along and within the proposed route). Obtain and review <br />existing field surveys from the City. In addition, the Engineer will identify physical conflicts <br />and constraints. <br />1. 1.3 Agency Coordination. Coordinate with the City and the Texas Department of <br />Transportation ("TxDOT") for rights-of-way, signage and drainage structure issues. In addition, <br />the Engineer will coordinate with the Texas Department of Licensing and Regulation ("TDLR") <br />for accessibility issues and with utility providers for utility structures. <br />1. 1.4 Set Design Criteria and Finalize Route. Recommend Design Criteria to include: <br />a) Pavement section and type; <br />b) Required utility relocations; <br />c) Traffic control; <br />d) Bikeway/ Pathway signage; and <br />e) Landscape and irrigation. <br />1.1.5 With City's input and direction, establish design criteria and finalize the Project route. <br />1.1.6 Prepare preliminary design documents and a preliminary opinion of probable cost. <br />1. 1.7 Presentation of Preliminary Documents. Meet with the City and TxDOT to obtain <br />consensus/approval of preliminary design and Project route. <br />1.2 TASK 2 - CONSTRUCTION DOCUMENTS AND PERMITTING <br />The Engineer will: <br />Doucet and Associates-Hike and Bike Trail <br />2
The URL can be used to link to this page
Your browser does not support the video tag.