Laserfiche WebLink
FM 3407 <br />Wonder World Dr. <br />Cost Proposal <br />BASIC SERVICES PERFORMED By KELLOGG BROWN S ROOT. INC <br />A. Project Management <br />Su" Mana ement <br />PROJECT <br />ENGINEER <br />STRUCT. <br />ENGINEER <br />SENIOR <br />ENGINEER <br />ENGINEER <br />SIT <br />TECH- <br />CADD <br />6ENIOR <br />ENVIRON. <br />JUNIOR <br />ENVIRON. <br />INSPECTOR <br />IROADWAYI <br />INSPECTOR <br />(BRIDGE) <br />GIS <br />CLERICAL <br />TOTAL <br />NUMBER <br />o$SNEETS <br />JOBHRS <br />per <br />Miscellaneous admin <br />KMANAGER <br />5 <br />10 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />10 <br />D <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />16 <br />N/A <br />SHEET <br />0 <br />0 <br />20 <br />35 <br />Nq <br />SUBTOTAL <br />15 10 0 0 LABOR RATE I HOUR 0 0 0 20 51 0 <br />5153.36 575.34 f1D655 $106.55 5121.08 353.81 <br />TOTAL LABOR COST $2,355 $o SO $0 f0 5807 $0 SO EO EO EO 51.0]6 §5.267 <br />I. BASIC SERVICES PERFORMED BY KELLOGG BROWN 8 ROOT, INC. <br />B. Assemble, ReWewb Evaluate Existlng Data PROJECT PROJECT STRUCT. SENIOR ENGINEER Eli TECH- SENIOR JUNIOR INSPECTOR INSPECTOR GIS CLERICAL TOTAL NUMBER <br />MANAGER ENGINEER ENGINEER ENGINEER JOBXRS <br />CADD ENVIRON. ENVIRON. (ROADWAY) (BRIDGE) of SHEETS per <br />NotA lio Ne <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />N/A <br />SHEET <br />SUBTOTAL <br />0 0 0 0 p 0 0 0 0 0 0 0 0 0 0 <br />. <br />LABOR RATER HOUR $171.53 5157.00 315606 5133.94 $107.01 $88.69 $80.72 $153.36 $75.34 $106.55 5106.55 $121.0B $53087 <br />TOTAL LABOR COST <br />§0 SO $0 $0 Sol $0 $0 $0 $a EO EO $01 Sol So <br />1. BASIC SERVICES PERFORMED BY KELLOGG BROWN 6 ROOT, INC. <br />C. Prepare Preliminary Design Report PROJECT PROJECT STRUCT. SENIOR ENGINEER EIT TECH. SENIOR JUNIOR INSPECTOR INSPECTOR GIS CLERICAL TOTAL NUMBER JOBHRS <br />MANAGER ENGINEER ENGINEER ENGINEER CADD ENVIRON. ENVIRON. (ROADWAY) (BRIDGE) &SHEETS per <br />NatA liable 0 0 0 0 0 0 0 0 0 p SHEET <br />0 0 0 0 NIA <br />SUBTOTAL <br />LABOR RATE /HOUR <br />TOTAL LABOR COST <br />0 <br />§1]1.53 <br />SO <br />0 <br />315700 <br />$0 <br />0 <br />3156.06 <br />SO <br />0 <br />5133.94 <br />SO <br />0 <br />§107.01 <br />EO <br />0 <br />§88.69 <br />50 <br />0 <br />$80.72 <br />f0 <br />0 <br />3153.36 <br />$0 <br />p <br />375.34 <br />SO <br />p <br />110655 <br />EO <br />o <br />3106.55 <br />SO <br />0 <br />5121.08 <br />50 <br />0 <br />553.87 <br />SO <br />o <br />f0 <br />p <br />L Niyxx.� __ _ _ n.bpmem.�n„Ab.mtiomrxi..0 NTI <uppMmvm.,b.� (kn \ <br />D3 00 <br />10 /16/28 <br />10 22 AA1 <br />