My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11032008 Regular Meeting
San-Marcos
>
City Clerk
>
01 City Council Minutes
>
2000 s
>
2008
>
11032008 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2017 4:37:34 PM
Creation date
12/5/2008 8:31:48 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Minutes
City Clerk - Type
Regular Meeting
Date
11/3/2008
Volume Book
178
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FM 3407 <br />Wonder World Dr. <br />Cost Proposal <br />I. BASIC SERVICES PERFORMED BY CLARK CONDON <br />PROVIDED BY FUGRO <br />PRINCIPAL <br />SEN. PROJ. <br />PROJECT <br />GEOLOGIST <br />DRAFT/ <br />ADMIN <br />TOTAL <br />TOTAL <br />MANAGER <br />GEOTECH. ENG. <br />CADD <br />Hours <br />Cost <br />$150.00 <br />$150.00 <br />$110.00 <br />$85.00 <br />$50.00 <br />$45.00 <br />A. Project Management <br />Not Applicable <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />$0.00 <br />SUBTOTAL <br />0 <br />0 <br />LABOR RATE HOUR <br />$150.001 <br />$150.0ol <br />0 <br />slio.001 <br />0 <br />$85.001 <br />0 <br />$50.001 <br />0 <br />$45.00 <br />0 <br />TOTAL LABOR COST <br />$0 <br />$0 <br />$0 <br />$of <br />$0 <br />$0 <br />$0 <br />$0.00 <br />PROVIDED BY FUGRO <br />PRINCIPAL <br />SEN. PROJ. <br />PROJECT <br />GEOLOGIST <br />DRAFT/ <br />ADMIN <br />TOTAL <br />TOTAL <br />MANAGER <br />GEOTECH. ENG. <br />CADD <br />Hours <br />Cost <br />$150.00 <br />$150.00 <br />$110.00 <br />$85.00 <br />$50.00 <br />$45.00 <br />B. Assemble, Review &Evaluate Existing Data <br />Not Applicable <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />$0.00 <br />SUBTOTAL <br />0 <br />0 <br />LABOR RATE IHOUR <br />$150.00 <br />$150.00 <br />0 <br />$110.00 <br />0 <br />$85.00 <br />0 <br />$50.00 <br />0 <br />$45.D0 <br />0 <br />TOTAL LABOR COST <br />$0 <br />$0 <br />$0 <br />$0 <br />$0 <br />$0 <br />$0 <br />$0.00 <br />PROVIDED BY FUGRO <br />PRINCIPAL <br />SEN. PROJ. <br />PROJECT <br />GEOLOGIST <br />DRAFT/ <br />ADMIN <br />TOTAL <br />TOTAL <br />MANAGER <br />GEOTECH. ENG. <br />CADD <br />Hours <br />Cost <br />$150000 <br />$150.00 <br />$110.00 <br />$85.00 <br />$50.00 <br />$45.00 <br />C. Prepare Preliminary Design Report <br />Not Applicable <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />SUBTOTAL <br />0 <br />LABOR RATEI HOUR <br />$150.00 <br />$150.00 <br />0 <br />$110.00 <br />0 <br />$85.00 <br />0 <br />$50.00 <br />0 <br />$4500 <br />MI. <br />TOTAL LABOR COST <br />$0 <br />$0 <br />$0 <br />$0 <br />$0 <br />$0 <br />PROVIDED BY FUGRO <br />PRINCIPAL <br />SEN. PROJ. <br />PROJECT <br />GEOLOGIST <br />DRAFT/ <br />ADMIN <br />TOTAL <br />TOTAL <br />MANAGER <br />GEOTECH. ENG. <br />CADD <br />Hours <br />Cost <br />$150.00 <br />$150.00 <br />$110.00 <br />$85.00 <br />$50.00 <br />$45.00 <br />D. Prepare Construction Documents <br />Not Applicable <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />$0.00 <br />SUBTOTAL <br />0 <br />0 <br />LABOR RATEIHOUR <br />$150.00 <br />$150.00 <br />0 <br />$110.00 <br />0 <br />$85.00 <br />0 <br />$50.00 <br />0 <br />$45.00 <br />0 <br />TOTAL LABOR COST <br />$01 <br />$0 <br />$0 <br />$0 <br />$0 <br />$0 <br />$0.00 <br />10/16/2008 <br />L High-2_ B.sincrr_Mld.p- ntSnnWl- Cunb -,WWD Supplcm ---k Change.1S --, No 5FM3407 C- Prop-d COS NV5.,]rCWkCUdO D9 10:_22 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.