My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2009-004
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2009
>
Res 2009-004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2009 8:53:27 AM
Creation date
1/7/2009 11:00:15 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2009-4
Date
1/6/2009
Volume Book
179
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5. Vehicle Travel Charge ................................. 60.00/trip <br />Reinforcing Steel: <br />1. Reinforcing Steel Observation ..................... $ 42.00/hr <br />2. Vehicle Travel Charge ................................. 60.00/trip <br />Structural Steel: <br />1. Structural Steel Observation (Certified $ 70.00/hr <br />Welding Inspection) <br />2. Non-Destructive Testing (Radiographic/ Cost + 15% (As required) <br />Ultrasonic) ................................................... <br />3. Elevated Tank Coating Inspections ............. Cost + 15% (As required) <br />4. Vehicle Travel Charge ................................. 60.00/trip <br />Asphalt <br />1. Field Density Tests ...................................... $ 15.00/ea <br />2. Technician Time-Observation & Density 44.00/hr <br />Testing ......................................................... <br />3. Vehicle Travel Charge ................................. 60.00/trip <br />4. Asphaltic Concrete Extraction, Gradation, <br />Bitumen Content, Stability, Laboratory <br />Density <br />and Maximum Theoretical Specific Gravity 390.00/set <br />5. Asphaltic Concrete Coring Equipment 150.00/day <br />Professional Services: <br />1. Project Coordination .................................... $ 57.00/hr <br />2. Geotechnical/Materials Engineer ................ 135.00/hr <br />3. Vehicle Travel Charge ................................. 60.00/trip <br />4. Project Completion Letter ........................... 250.00/total <br />5. Report Preparation/Report Distribution 10% total costs <br />5
The URL can be used to link to this page
Your browser does not support the video tag.