My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2009-009
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2009
>
Res 2009-009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2009 8:52:12 AM
Creation date
1/7/2009 11:42:49 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2009-9
Date
1/6/2009
Volume Book
179
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 1.5 Disposal of Recyclable Materials and Solid Waste <br />1.5.1 Disposal <br />The Contractor will haul and dispose of, or will arrange for the hauling and disposal of, all <br />recyclable materials and solid waste collected by it at a recyclable materials processing facility or <br />a solid waste disposal site licensed by the State of Texas for that purpose. The Contractor will <br />make every reasonable effort to dispose of recyclable materials at a recyclable materials <br />processing facility rather than at a solid waste disposal site. The processing facility and disposal <br />site will have adequate capacity to accommodate the requirements of this Contract. Any costs of <br />disposal, including without limitation, tipping, drop-off, processing or other fees charged for <br />processing or disposal are included in the fees set forth in this Contract. <br />1.5.2 Ownership of Collected Recyclable Materials <br />The Contractor accepts title to all recyclable materials placed in the Contractor's collection <br />vehicles, or received by the Contractor at the recycling center. The City does not accept <br />ownership or title to any such items. <br />1.5.3 Notifications and Disposal Site Reports <br />The Contractor will forward, to the City at its request, all copies of Texas Health Department <br />Inspection Reports for each recyclable materials processing facility and disposal site being used <br />for the disposal of recyclable materials collected under this Contract. <br />1.5.4 Interruption of Service <br />Notwithstanding any other provision of this Contract, if an interruption in the Contractor's <br />services continues for a period of ten days, the City will have the right to immediately terminate <br />this Contract and to seek any remedy provided by law. <br />ARTICLE 2 <br />THE CITY'S RESPONSIBILITIES <br />Section 2.1 <br />The City will designate Tom Taggart, Director of Public Services to act as the City's authorized <br />representative with respect to this Contract. <br />Section 2.2 <br />The City will assist the Contractor in encouraging customers and City employees to comply with <br />regulations by providing instruction, public service contact, and informational materials. <br />Page 5
The URL can be used to link to this page
Your browser does not support the video tag.