My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2009-007
San-Marcos
>
City Clerk
>
02 Ordinances
>
2000 s
>
2009
>
Ord 2009-007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2009 8:52:47 AM
Creation date
2/9/2009 10:58:25 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Code of Ordinances
Number
2009-7
Date
2/3/2009
Volume Book
179
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• expiFat,eR shall he is-sued when the GFiteFia conditions in subsection (1) are no <br />longer satisfied, or as otherwise determined by the director. <br />(b) Stage 2. <br />(1) Stage 2 shall be implemented when any one of the following conditions occur: <br />(A) At R-00 m the I°vI ot ct?°c f th ?;fce. The 10-day average aquifer <br />At , °r? <br />level is less than 640 650 feet above mean sea level as measured at the <br />J-17 index well; or <br />(B) The 510-day FURR*Rg average discharge rate of San Marcos Springs <br />is below 80 cfs as measured at the San Marcos gauging station; or <br />(C) The 510-day ftFF}ROR9 average discharge rate of Comal Springs is <br />below 4-54 200 cfs as measured at the Comal gauging station. <br />(2) Stage 2 shall be terminated at 9;00 on the 2-Ge iday after issuance of <br />nc ticve of expi at"GR anleSS otherwise determined by thed*Fest F. A Reuse 9# <br />exp*Fatien shall he 1°°"ed- when the GFIteFia conditions in subsection (1) are no <br />longer satisfied, or as otherwise determined by the director. <br />(c) Stage 3. <br />is (1) Stage 3 shall be implemented when any one of the following conditions occur: <br />(A) At Q:nn a m the level of the „n„ife. The 10-day average aquifer <br />level is less than 638 640 feet above mean sea level as measured at the <br />J-17 index well; or <br />(B) The 510-day ruRR*Rg average discharge rate of San Marcos <br />Springs is below 65 cfs as measured at the San Marcos gauging station; <br />or <br />(C) The 510-day FWRRiR9 average discharge rate of Comal Springs is <br />below 86-150 cfs as measured at the Comal gauging station. <br />(2) Stage 3 shall be terminated at 9;00 a n the 20th day afteF i s--amre of <br />expiFatieR shall he issued when the conditions GFiteFia in subsection (1) are no <br />longer satisfied, or as otherwise determined by the director. <br />(d) Stage 4 <br />(1) Stage 4 shall be implemented when any one of the following conditions occur: <br />(A) At 8;00 -a.rn-9n the 30th day after issuance of n9ziQe 9 <br />t+emmennement of stage III if the level of the aq rifer re Fnain at le s than <br />t <br />40630 fee?>; t ap ov?,?? e rm???Tt ean level as , R??, ureasaT? t trend at the i„n/de ??iT? ?o?r-??a?- .r te, The 10-day <br />average aquifer level is less than 630 feet above mean sea level as <br />measured at the J-17 index well; or <br />5
The URL can be used to link to this page
Your browser does not support the video tag.