Laserfiche WebLink
<br />for the proper implementation of the intent of the construction contract documents, and <br />with the approval of the City, the Engineer will have authority to require special inspection <br />or testing of the work in accordance with the provisions of the construction contract <br />documents, whether or not such work is then fabricated, installed or completed. The <br />Engineer will review the work and results of all testing laboratories as required by the <br />construction contract documents. <br /> <br />1.4.20 Review and make all decisions regarding the approval or taking of other appropriate <br />action upon the Contractor's submittals, including but not limited to, shop drawings, product <br />data and samples, schedule of values and progress schedule. Such action will be taken <br />with reasonable promptness, but generally not to exceed 15 days or such period of time <br />as will not cause delay of the Project. <br /> <br />1.4.21 Prepare minor changes in the plans and specifications as directed by the City; and <br />prepare necessary change orders in triplicate originals for approval by the City and <br />execution in accordance with the construction contract documents. Engineer will not issue <br />change orders not previously approved in writing by City, and no course of conduct on the <br />part of Engineer or City will amend, waive or alter this provision. <br /> <br />1.4.22 Conduct professional inspections to determine the dates of substantial completion <br />and final completion for the Project, to evaluate the work for acceptable conformance with <br />the construction contract documents and in light of any subsequent tests performed as <br />described in Subsection 1.4.19 to verify that any minor deviations from the construction <br />contract documents as described in Subsection 1.4.24 have been corrected and that the <br />reasons for any specific qualifications in any and all previous certificates for payment as <br />described in Subsection 1.4.24 hereof are either no longer valid or the condition(s) and/or <br />problem(s) have been corrected; will receive and review written warranties and related <br />documents required by the construction contract documents and assembled by the <br />Contractor; will issue final certificates for payment or take other appropriate action; and will <br />make a written recommendation to the City regarding the City's acceptance of the Project. <br /> <br />1.4.23 Determine the amounts owing to the Contractor based on its on-site professional <br />inspections and on evaluations of the Contractor's applications for payment including <br />comparisons of Contractor's monthly cost reports with its applications for payment, and will <br />make recommendations for payment in these amounts, as provided in the construction <br />contract documents, or take such other appropriate action which the Engineer deems <br />necessary. <br /> <br />1.4.24 Make recommendations for payment that constitute a representation by Engineer <br />to the City, based on the Engineer's on-site inspections as provided in subsection 1.4.12 <br />and on the data comprising the Contractor's application for payment, that the work has <br />progressed to the point indicated; that, to the best of the Engineer's knowledge, information <br />and belief, the quality of the work is in acceptable conformance with the construction <br />contract documents (subject to an evaluation of the work for conformance with the <br />construction contract documents upon substantial completion, subject to the results of any <br /> <br />4 <br />