My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12072010 Regular Meeting
San-Marcos
>
City Clerk
>
01 City Council Minutes
>
2010's
>
2010
>
12072010 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2017 4:22:28 PM
Creation date
12/28/2010 2:00:22 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Minutes
City Clerk - Type
Regular Meeting
Date
12/7/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROPOSED CONTRACT MODIFICAIIUN <br />OWNER <br />CITY OF SAN MARCOS, TEXAS <br />PROJECT NO. <br />OAKRIDGE BOOSTER PUMPING <br />OWNER <br />PROJECT <br />STATION <br />CONTRACTOR <br />KEYSTONE CONSTRUCTION, INC. <br />CONTRACTOR <br />BURY AND PARTNERS - PUBLIC <br />ENGINEER 80053 -01 <br />ENGINEER <br />WORKS, INC. <br />JASON ROBERTS, P.E. <br />PCM NO. 6 <br />NOTIFICATION TO CONTRACTOR: <br />WE ARE CONSIDERING MAKING THE CHANGE TO THE CONTRACT DESCRIBED IN THE ATTACHED MATERIALS AND <br />REQUEST THAT YOU TAKE THE FOLLOWING ACTION: <br />NOTIFY US THAT YOU CONCUR THAT THIS CHANGE DOES NOT REQUIRE A CHANGE IN CONTRACT TIME OR <br />AMOUNT. A FIELD ORDER WILL BE ISSUED. <br />®SUBMIT A PRICE PROPOSAL WITH DETAILED COST BREAKDOWN AND REVISED SCHEDULE FOR PERFORMING <br />THE DESCRIBED CHANGE. <br />A CHANGE ORDER WILL BE ISSUED FOR PAYMENT AT THE UNIT PRICE BID. <br />PROCEED WITH THE CHANGE UNDER T E TIME AND MATERIALS PROVISION OF THE CONTRACT. <br />BY: � /` /� DATE: 7 /Z A/' C) <br />CONTRACTOR'S RESPONSE: <br />WE RESPOND TO YOUR REQUEST AS FOLLOWS: <br />WE CONCUR THAT THIS IS A NO COST OR TIME CHANGE. ISSUE FIELD ORDER. <br />WE <br />FOR SUBMIT THE TAAE DESCRIBED CHANGE` WITH AL COST IS $ COST BREAKDOWN AND REVISED SCHEDULE <br />WE ARE PROCEEDING WITH THE CHANGE AT THE UNIT PRICE BID. <br />=G PR ING W H T CH GE U R T TIME AND MATERIALS PROVISION OF THE CONTRACT. <br />l <br />BY: DATE: b - 74—/0 <br />ACTION TAKEN: <br />n PROPOSED CONTRACT MODIFICATION REJECTED. CONTRACTOR NOTIFIED NOT TO PROCEED. <br />N <br />DATE: <br />FIELD ORDER ISSUED: NO: DATE: BY: <br />CHANGE ORDER ISSUED: NO: DATE: it BCC <br />INSTRUCTIONS: <br />Provide a detailed cost break down and a schedule to change the primer system from Rustbond to <br />Carbozine 859. The cost should include surface preparation (including shrouding), changes in material <br />costs, and changes in labor costs associated with the change in primer. <br />P:U Engincering1K0053 - San Mwcos\0 1\1 0.09 Change Orden \PCM 06 20100915.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.