Laserfiche WebLink
<br />1.6.3 Prepare a general traffic control plan for the boring of Clovis Barker Road. The Engineer <br />will require the Contractor to prepare a site specific control plan. <br /> <br />1.6.4 Design cathodic protection for the water line (if required). <br /> <br />1.6.5 Develop and document a method for disposal or reuse of pipeline disinfection/testing <br />water. <br /> <br />1.6.6 Finalize Project permitting through TxDOT and Hays County. <br /> <br />1.6.7 Submit final plans to TCEQ. <br /> <br />1.6.8 Prepare the final cost estimate for review by the City. The final construction cost <br />estimate will be the total estimated cost to the City of all elements of the Project designed or <br />specified by the Engineer. <br /> <br />1.6.9 Assist the City in the preparation of construction contract documents using City forms <br />based on the approved design development documents and any further adjustments authorized by <br />the City in the scope, quality or budget of the Project. These contract documents will include <br />detailed plans and technical specifications required for the Project to be accurately bid and <br />efficiently constructed. Furthermore, the Engineer will use its best professional judgment to <br />create documents that comply with applicable construction and development codes, local <br />regulations and ordinances and other federal and state regulations which are known or which <br />should reasonably be known to the Engineer. <br /> <br />1.6.10 Ensure that no reports, maps, or other documents produced in whole or in part under this <br />Agreement shall be the subject of an application for copyright by or on behalf ofthe Engineer. <br /> <br />1.6.11 Obtain approval from the appropriate City inspectors of all technical plans and <br />specifications necessary for successful completion of the Project prior to allowing the <br />construction contract to be let for bid. <br /> <br />1.7 TASK 6 - BIDDING AND CONSTRUCTION ADMINISTRATION <br /> <br />The Construction phase of this Project will commence with the award of the construction <br />contract and will terminate when the Project is accepted by the City. The Engineer will: <br /> <br />Bidding <br /> <br />1.7.1 Assist the City in the distribution of the bid documents to prospective bidders and to plan <br />rooms and the issuance of addenda (if any) following City's prior approval. <br /> <br />1.7.2 Assist the City in obtaining bids, tabulating bids, preparing bid tabulation forms, and in <br /> <br />6 <br />