Laserfiche WebLink
(b) The director may require field inspection of the customer's premises, in • <br />addition to plan submittal and review, to determine the actual or potential hazards and <br />backflow prevention assembly requirements. <br />(c) All mechanical layouts or building plans submitted to the building <br />inspections division will be reviewed to assure compliance with the requirements of this <br />article and the plumbing code. All mechanical layouts or plans will be stamped by the <br />building inspections division to indicate that containment backflow prevention may be <br />required, and contact must be made with the director for a determination. <br />(d) A new customer's application for water service must be accompanied by a <br />mechanical layout or plan for all proposed structures to be connected to the city water <br />system, showing or describing all plumbing arrangements and indicating the proposed <br />type and size of backflow prevention assemblies to be installed. This information will be <br />routed through the director to ensure compliance with the provisions of this article. Upon <br />installation and testing of the approved assembly or air gap arrangement, the director will <br />make a record of the installation. <br />(e) Customer service inspections. In accordance with TCEQ Rules, <br />the director will require a customer service inspection certification in all of the following: <br />(1) Prior to providing continuous water service to new construction; <br />(2) On any existing service when the water purveyor has reason to • <br />believe that cross connections or other unacceptable plumbing <br />practices exist; and <br />(3) After any substantial improvement, alteration, correction, or <br />addition to a customer's system. <br />Sec. 86.602. Existing facilities. <br />(a) Inspection procedure. The director will inspect the existing facilities of all city <br />water system customers of the types listed in section 86.592(f), (g) or (h), that do not <br />have a record of backflow prevention assembly installation on file in the water and <br />wastewater department. After the inspection is completed, the director will provide a <br />written notice to the customer advising of the backflow prevention assembly <br />requirements for the customer's system. <br />(b) Building inspections - -Plan review. Plans submitted to the building inspections <br />division for approval of plumbing modifications, or additions to an existing plumbing <br />system, will be reviewed by the director to determine the type of backflow prevention <br />method or assembly required for the entire establishment. The method and type of <br />assembly required will be noted on the plans. <br />16 <br />