My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03242011 Regular Meeting
San-Marcos
>
City Clerk
>
01 City Council Minutes
>
2010's
>
2011
>
03242011 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 1:58:15 PM
Creation date
4/6/2011 9:26:14 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Minutes
City Clerk - Type
Regular Meeting
Date
3/24/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Attachment A <br />Wastewater Conveyance System Modeling Services <br />Change In Services Request <br />Submitted by CH2M HILL <br />March 3, 2011 <br />PROJECT DESCRIPTION <br />To support ongoing decision making associated with current and future conveyance needs, <br />the City requires wastewater modeling to be completed. This Change In Services request is <br />for a continuation of work currently being provided under the Wastewater Conveyance <br />System Modeling Services contract. Anticipated potential work assignments will be similar <br />to those completed under the existing contract and may include: <br />• Evaluation of new flows or lines required as a result of new development; <br />• Evaluation of change in flow in existing system; <br />• Evaluation of changes in pipe sizing to reduce surcharging/ overflows; <br />• Line realignments including future diversions or bypasses; <br />• Incorporation of additional service areas not currently represented in the model; <br />• Using City - provided conveyance system information currently available in CIS database <br />and incorporating this into the existing model database; <br />• Evaluation and modification of 1/1 and dry weather flow information within the model <br />using available flow data; <br />Each modeling assignment will be discussed with the City in order to develop clear <br />objectives and deliverables needed. After meeting with the City, CH2M HILL will provide <br />an estimate of the level of effort and schedule required to complete the assignment. <br />Upon written agreement from City staff (email correspondence is acceptable), CH2MHILL <br />will begin work on the modeling assignment. Upon completion of the assignment, <br />CH2MHILL will prepare and submit to City a technical memorandum documenting data <br />and assumptions used in generating the model runs and model results. <br />CH2MHILL and City staff will meet monthly to review modeling activities in progress and <br />will also review technical memoranda submitted. CH2MHILL will provide meeting <br />minutes within five days of each meeting. In addition CH2MHILL will log modeling <br />assignments and status to facilitate tracking progress on modeling activities. <br />It is anticipated that this Change In Services request will allow for the continuation of <br />modeling services for approximately five more months. The actual length of extended <br />modeling services will depend on the actual modeling activities assigned to CH2MHILL by <br />the City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.