My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04052011 Regular Meeting
San-Marcos
>
City Clerk
>
01 City Council Minutes
>
2010's
>
2011
>
04052011 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2012 1:58:53 PM
Creation date
4/14/2011 11:15:10 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Minutes
City Clerk - Type
Regular Meeting
Date
4/5/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CHANGE ORDER # 4 <br />CITY OF SAN MARCOS, TEXAS <br />PROJECT: Oakridge Booster Pump Station <br />CONTRACTOR: Keystone Construction Inc. <br />ORIGINAL CONTRACT DATE: March 11, 2010 <br />CHANGE ORDER DATE: March 9, 2010 <br />WORK TO BE ADDED TO OR DELETED FROM SCOPE OF SERVICES <br />• Deduct 30 feet of overhead electric service. <br />• Add 60 feet of underground electric service with concrete encasement. <br />• Modify the hydro pneumatic tank controls to include a manifold, site glass, and sensors. <br />• Add a concrete LAS ramp into the existing. <br />• Clear and grub the new PEC easement to facilitate construction of the overhead electric <br />lines. <br />• Demolish and haul the existing concrete air compressor building foundation. <br />• Demolish and haul the existing hydro pneumatic tank and concrete tank foundation. <br />• Revise the grading and include a retaining wall, if necessary, near the foundation of GST <br />#1 and the drainage channel. <br />Change in contract time 87 days <br />Previous contract amount: $ 821,038.22 <br />Net increase /decrease in contract amount: $ 37,354.10 <br />Revised contract amount: $ 858,392.32 <br />Previous contract time of completion (substantial /final) 340 / 370 days <br />Net increase /decrease in contract time of completion 87 days <br />Revised contract time of completion (substantial /final) 427 / 457 days <br />Percent of Change 4.5% <br />Recomme <br />Engi r: <br />by: Date: 3 <br />T. ason Roberts, P.E. <br />Project Manager, Associate <br />Change Form 6/712004 <br />