My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2005-086
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2005
>
Res 2005-086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2006 2:11:50 PM
Creation date
2/22/2006 2:11:20 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2005-86
Date
7/5/2005
Volume Book
162
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />12.3 The total of all fees and expenses to be paid to Engineer for Basic Services as described <br />in Sections 1.1 through 1.17 will not exceed $400,000.00. All reimbursable expenses will be <br />invoiced at actual cost plus five percent. These include, but are not limited to reproduction, <br />rented or leased equipment, etc. Subconsultant expenses (i.e. surveying services) will be <br />invoiced at cost. This compensation is divided among the Basic Services as follows: <br /> <br />TASK 1 - PROJECT STARTUP <br />TASK 2 - COLLECTION OF BASELINE INFORMATION <br />TASK 3 - ENVIRONMENTAL CONSTRAINTS <br />TASK 4 - REVIEW AND IDENTIFICATION OF <br />FLOOD AND DRAINAGE PROBLEM AREAS <br />TASK 5 - FIELD SURVEY COLLECTION <br />TASK 6 - HYDROLOGIC MODEL DEVELOPMENT <br />TASK 7 - HYDRAULIC MODEL DEVELOPMENT <br />TASK 8 - EVALUATION OF FLOOD PROTECTION CRITERIA <br />TASK 9 - REVIEW AND EVALUATION OF FLOOD <br />PROTECTION MEASURES AND ALTERNATIVES <br />TASK 10 - HYDROLOGIC AND HYDRAULIC A..~ALYSIS <br />OF ALTERNATIVES <br />TASK 11 - BENEFIT/COST ANALYSIS <br />TASK 12 - PREPARATION OF EVALUATION CERTIFICATES <br />TASK 13 - IMPLEMENTATION AND PLANNING <br />TASK 14 - EARLY FLOOD WARNING SYSTEM <br />TASK 15 - DUAL PURPOSE FLOOD CONTROL AND <br />WATER SUPPLY <br />TASK 16 - FINAL DELIVERABLES <br /> <br />TOTAL FEE: <br /> <br />$ 2,860.00 <br />$ 7,820.00 <br />$ 10,140 .00 <br /> <br />$ 5,340.00 <br />$117,060.00 <br />$ 79,620.00 <br />$ 73,320.00 <br />$ 3,660.00 <br /> <br />$ 3,660.00 <br /> <br />$ 54,560.00 <br />$ 26,280.00 <br />$ 1,360.00 <br />$ 3,880.00 <br />$ 1,500.00 <br /> <br />$ 1,500.00 <br /> <br />$ 7,440.00 <br /> <br />$ 400,000.00 <br /> <br />This Agreement will be effective as of the day and year established in the first paragraph <br />of this Agreement. <br /> <br />City of San Marcos <br /> <br />Espey Consultants, Inc. <br /> <br /> <br />BY~ffA <br />igna ) <br /> <br />ager <br /> <br />,(JtztAN /C. ;eGIS <br />(Printed or typed name) <br /> <br />Espey Agreement <br /> <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.