My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2005-071
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2005
>
Res 2005-071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2006 4:53:24 PM
Creation date
3/1/2006 4:48:51 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Contract
Number
2005-71
Date
6/7/2005
Volume Book
162
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />LAURIE ANN ANDERSON, P.E. <br /> <br />li:',DUCATION <br /> <br />CIVIL ENGINEERING, B.8.. 1982. <br />University of Texas at Austin. <br /> <br />CERTIFIED PUBLIC ADMINISTRATOR PROGRAM, 1998-1999 <br />Texas State University at San Marcos, San Marcos Texas <br /> <br />EXPERIENCE <br />Aprill!J99.. <br />Present <br /> <br />Director of Engineering, Environment & Engineering Department <br />City of San Marcos, San Marcos, Texas. <br />Directs engineering fimcti.ons for City of San Marcos through the City of San Marcos Environment & <br />Engineering Depa.rtnleDt. Responsible for plarmine, design, and construction of water, wastewater, street and <br />drainage capital improvement projects. Respons1ble for developing the city's policies, guidelines, and design <br />criteria for public and private construc:ti.on and development. Administers the city's floodplain management and <br />participation in the Community Rating System. In 2002 San Marcos increased its rating from an 8 to a 7. <br />Manages depar1mental staff of 12 with an annual budget of$857K. <br /> <br />April 1988- <br />August 1999 <br /> <br />Senior Engineer, Environment & Engineering Deparbnent <br />City of San Marcos, San Marcos, Texas. <br />Responsible for design and project management for City's capital improvement program. Oversaw development <br />review process. Directly te8pODSlble for over $50 million in capital improvement projects. <br /> <br />June 1985- <br />April!988 <br /> <br />Design Enpneer <br />Anderson Engineering, San Antonio, Texas <br />Responsible for public water and wastewater system design for small municipalities surrounding San Antonio <br />Metropolitan area. Prepared construction plans for private development including subdivision layout, water, <br />wastewater, street, and drainage plans for review and approval by City of San Antonio and other regulatory <br />agencies. <br /> <br />May 19~ <br />June 1985 <br /> <br />Engineer, Hydrology & Hydraulic Section <br />u.s. Army Corps of Engineers, Galveston, Texas. <br />Responsible HEC 1 and HEC-2 analysis of bayous in the Houston area including Sinnns, Buffalo and Greens <br />bayou. Determined flood elevation reductions for various channel improvement scenarios for cost benefit <br />analysis. <br /> <br />PROFESSIONAL <br />AFFLIATIONS <br /> <br />Certifications: <br />Professional Engineering License (p.E.) No. 64618, Texas State Board of Professional Engineers <br /> <br />Technical Advisory Committee, Capital Area Metropolitan Organization <br />Water Environment Federation <br />American Water Works Association <br />Water ReUse Association <br />Floodplain Managers Association <br /> <br />PUBLICATIONS! Compliance with the Endangered Species Act in construction of a river crossing, Water Environment Federation <br />PRESENTATIONS 66th Annual Conference, October 1993, Anaheim, CA and Water Environment Association of Texas Annul <br />Conference, April 1995, Austin, TX <br /> <br />Exhibit A, Page 76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.