Laserfiche WebLink
<br />City of San Marcos <br /> <br />TPDES Permit No. WQOO 1 0273002 <br /> <br />3. Records of Results <br /> <br />a. Monitoring samples and measurements shall be taken at times and in a manner so as to be representative of the monitored <br />activity. <br /> <br />b. Except for records of monitoring information required by this permit related to the permittee's sewage sludge use and <br />disposal activities, which shall be retained for a period of at least five years (or longer as required by 40 CFR Part 503), <br />monitoring and reporting records, including strip charts and records of calibration and maintenance, copies of all records <br />required by this pennit, records of all data used to complete the application for this permit, and the certification required <br />by 40 CFR 9 264.73(b)(9) shall be retained at the facility site, or shall be readily available for review by a TCEQ <br />representative for a period of three years from the date of the record or sample, measurement, report, application or <br />certification. This period shall be extended at the request of the Executive Director. <br /> <br />c. Records of monitoring activities shall include the following: <br /> <br />1. date, time and place of sample or measurement; <br />11. identity of individual who collected the sample or made the measurement. <br />iiL date and time of analysis; <br />iv. identity of the individual and laboratory who performed the analysis; <br />v. the technique or method of analysis; and <br />VI. the results of the analysis or measurement and quality assurance/quality control records. <br /> <br />The period during which records are required to be kept shall be automatically extended to the date of the [mal <br />disposition of any administrative or judicial enforcement action that maybe instituted against the pennittee. <br /> <br />4. Additional Monitoring by Permittee <br /> <br />If the permittee monitors any Pollutant at the location( s) designated herein more frequently than required by this permit using <br />approved analytical methods as specified above, all results of such monitoring shall be included in the calculation and <br />reporting of the values submitted on the approved self-report form. Increased frequency of sampling shall be indicated on <br />the self-report form. <br /> <br />5. Calibration of Instruments <br /> <br />All automatic flow measuring or recording devices and all totalizing meters for measuring flows shall be accurately calibrated <br />by a trained person at plant start-up and as often thereafter as necessary to ensure accuracy, but not less often than annually <br />unless authorized by the Executive Director for a longer period. Such person shall verify in writing that the device is <br />operating properly and giving accurate results. Copies of the verification shall be retained at the facility site and/or shall be <br />readily available for review by a TCEQ representative for a period of three years. <br /> <br />6. Compliance Schedule Reports <br /> <br />Reports of compliance or noncompliance with, or any progress reports on, interim and final requirements contained in any <br />compliance schedule of the permit shall be submitted no later than 14 days following each schedule date to the Regional <br />Office and the Enforcement Division (MC 224). <br /> <br />7. Noncompliance Notification <br /> <br />a. In accordance with 30 TAC 9 305.125(9) any noncompliance which may endanger human health or safety, or the <br />environment shall be reported by the permittee to the TCEQ. Report of such information shall be provided orally or by <br />facsimile transmission (FAX) to the Regional Office within 24 hours of becoming aware of the noncompliance. A written <br />submission of such information shall also be provided by the pennittee to the Regional Office and the Enforcement <br />Division (MC 224) within five working days of becoming aware of the noncompliance. The written submission shall <br />contain a description of the noncompliance and its cause; the potential danger to human health or safety, or the <br />environment; the period of noncompliance, including exact dates and times; if the noncompliance has not been corrected, <br />the time it is expected to continue; and steps taken or planned to reduce, eliminate, and prevent recurrence of the <br />noncompliance, and to mitigate its adverse effects. <br /> <br />b. The following violations shall be reported under Monitoring and Reporting Requirement 7.a.: <br /> <br />Page 5 <br />