My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2005-113
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2005
>
Res 2005-113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2006 9:35:03 AM
Creation date
5/23/2006 9:34:39 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Amendment
Number
2005-113
Date
9/6/2005
Volume Book
163
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />16. <br /> <br />Ian <br /> <br />Lockwood, Andrews <br />& Newnam, Inc. <br />A LEO A DAL'( COMPAI<lY <br /> <br />September 6, 2005 <br /> <br />To: Laurie Anderson, City of San Marcos <br /> <br />Subject: Summary of Interim Activities <br />Carrizo- Wilcox Feasibility Project <br /> <br />1. Feasibility Study Summary <br /> <br />The initial feasibility report was completed in March 2005. The report identifies specific <br />target areas for the development of Carrizo- Wilcox groundwater that would produce with <br />reasonable assurance the supply necessary for the long-term future (year 2060) needs of the <br />Participants. The long-term need of all Participants is 27 MGD based on water demand <br />information provided by each Participant. The City of San Marcos provided the following <br />infonnation on its future water needs: <br /> <br />Year Demand Supply Need <br />2000 I 5.620 I 13.689 8.069 <br />2004 6.350 ! 13.689 7.339 <br />2010 7.905 13.689 5.784 <br />2020 10.663 13 .689 3.026 <br />2030 13.496 i 13.689 0.193 <br />2040 16.642 13.689 -2.953 <br />2050 20.275 t 13.689 -6.586 <br />2060 22.985 13.689 -9.296 <br /> <br />2. Interim Activities <br /> <br />The project for the acquisition and use of Carrizo- Wilcox groundwater was undertaken in <br />three phases: <br />Phase 1 - Feasibility Study (complete) <br />Interim Activities ~ Initial work on Supply Acquisition Plan, Meetings <br />with Potential Participants, Organizational Issues, and Scoping Efforts <br />Phase 2 - Wholesale Water Use Plan / Plumbing Plan <br />Phase 3 - Acquisition of Groundwater Supply <br /> <br />Based on meetings with the Participants, the Feasibility report identified several "next step" <br />issues that the Participants needed to undertake in order to secure the opportunity for a long- <br />term Carrizo- Wilcox groundwater supply. The group recognized that this groundwater, in <br />the areas targeted in the report, would have limited availability because others, including the <br />San Antonio Water System, were also interested in acquiring supplies in the same area. <br /> <br />The Participants that have continued to meet and review the interim activities are the Cities <br />of San Marcos, Kyle, and Lockhart and several water supply corporations jointly represented <br /> <br />215 Mary Street, Suite 305, Waco, TX 76701 Phone: (254) 753-9585, FAX: (254) 753-9593 <br />
The URL can be used to link to this page
Your browser does not support the video tag.