My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2002-043
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2002
>
Res 2002-043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2006 10:01:12 AM
Creation date
6/23/2006 10:01:02 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2002-43
Date
3/4/2002
Volume Book
146
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />THE Cl'1"- OF <br />SA..N !\1.Al{(~()S <br /> <br /> <br />March 4, 2002 <br /> <br />Providence Environmental Consulting, Inc. <br />112 Las Colinas Drive <br />Georgetown, Texas 78628 <br /> <br />Attention: Ms. Tracy Dubcak, P.E. <br /> <br />Dear Ms. Dubcak: <br /> <br />This letter shall serve as the revised agreement between the City of San Marcos, Texas ("City") <br />and Providence Environmental Consulting, Inc. ("Consultant") for the provision of engineering <br />servIces. <br /> <br />A. GOALS AND ACTIVITIES <br /> <br />Consultant agrees to use its best professional efforts to accomplish the following goals, through <br />the following activities, on behalf of the City: <br /> <br />GOAL 1: To provide engineering expertise and value engineering assistance on the <br />Cottonwood Creek Wastewater Interceptor C.I.P. project through the technical <br />review of contract documents. <br /> <br />ACTIVITIES: <br /> <br />1.1 Review plans and specifications, design manuals, calculations and manufacturer <br />literature for the project specifically focusing on the two lift stations and force <br />mams <br /> <br />1.2 Coordinate with pump manufacturers, City engineering and operations staff, <br />design engineer and contractors to insure that the project plans and specifications <br />reflect a project that is cost effective to construct and provides for optimum <br />operation. <br /> <br />1.3 Prepare written comments and reports. <br /> <br />1.4 Schedule and attend meetings with the City, design engineer and others. <br /> <br />GOAL 2: To prepare standard calculations, drawings and specifications for lift <br />station and force main construction to be incorporated in the City's Manual for <br /> <br />City Hall @O 630 East Hopkins · San Marcos, Texas 78666 · 512/393-8150 · FAX 512/393-3983 <br />
The URL can be used to link to this page
Your browser does not support the video tag.