Laserfiche WebLink
<br />Draft 3-7-02 <br /> <br />required Water Production and Water Distribution Facilities, <br />pursuant to TNRCC Rule 30 T AC Chapter 290. <br /> <br />Provide an analysis prepared by a registered engineer determining <br />the projected water use of the final expected number of residences, <br />businesses, or other dwellings in the platted area. <br /> <br />Submit a copy of an executed contract, agreement, or commitment <br />letter from the TNRCC or the Guadalupe Blanco River Authority <br />stating surface water, in an amount adequate to meet the water <br />needs as identified in the above engineering analysis, has been <br />committed to the platted area for a period of 20 years or greater. <br />Said document shall identify the amount of surface water <br />committed, the point of diversion, and the term of the commitment. <br /> <br />Provide a surety, in a form acceptable to the City, in an amount <br />determined by the City Engineer, to ensure the proper completion <br />of any and all Water Distribution Facilities such as water mains, <br />valves, and other necessary water distribution appurtenances. <br /> <br />vi) if the proposed lots are to be served by an existing public water system <br />utilizing groundwater and currently providing service to less than 1000 <br />connections, <br /> <br />Provide documentation from the existing Public Water System <br />indicating that the existing system has agreed to provide water <br />service to the platted area. <br /> <br />Provide a copy of the latest TNRCC Public Water Sanitary Survey <br />of the existing Public Water System indicating no alleged <br />violations pertaining to water quality or water production <br />capability. <br /> <br />Provide an engineering analysis of the existing Public Water <br />System showing that the existing system has an adequate Water <br />Supply and adequate Water Production Facilities to serve the final <br />expected number of residences, businesses, or other dwellings in <br />the existing service area in addition to the needs of the final <br />expected number of residences, businesses, or other dwellings in <br />the proposed platted area. <br /> <br />If the existing public water system uses groundwater regulated by <br />the Edwards Aquifer Authority, submit documentation from the <br />Edwards Aquifer Authority indicating the permit allocation of <br />groundwater rights necessary to meet the needs identified to the <br />preceding paragraph. The permit allocation cannot involve leased <br /> <br />4 <br />