My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2011-024
San-Marcos
>
City Clerk
>
02 Ordinances
>
2010's
>
2011
>
Ord 2011-024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2011 11:49:12 AM
Creation date
6/2/2011 11:39:32 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
Number
2011-24
Date
5/17/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
O A fee shall be paid to the City pon application for a public right -of -way construction <br />permit unless provided otherwise in section 74.155. The amount of the application fee is <br />established by resolution of the city council No application shall be considered to have been <br />received by the City until the fee has been paid. <br />(d) The Director shall act to grant or deny a public right -of -way construction permit within <br />ten days of the date that application for the permit is received by the City. Failure to act within <br />that time shall result in the application being approved and the public right-of-way construction <br />permit being issued on the following working day. <br />(e) When acting to approve an application and to grant a public right -of -way construction <br />permit, the Director: <br />(1) May impose restrictions upon the timing of construction which in his opinion are <br />reasonable measures to protect the safety and convenience of the general public <br />(2) Shall prescribe the placement of barricades and warning lights and signs which are in his <br />opinion, reasonable measures to protect the safety of the general public and of the <br />workers performing the construction. <br />(fl If the Director disapproves an application for a public right -of -way construction permit <br />and denies it, the applicant shall be notified of this action in writing via certified mail This <br />notice shall include a statement of the reasons for disapproval and denial An application for a <br />public right -of -way construction permit may only be denied for the following reasons which are <br />not subject to appeal: <br />(1) The contents of the application do not fulfill the requirements outlined in this article <br />and /or as prescribed in the City right -of -way construction policies and procedures as <br />promulgated by the Director. <br />(2) The design and /or materials proposed for execution of the construction do not meet the <br />standards prescribed in the City right -of -way construction policies and procedures or the <br />manual for design and construction. <br />(g) Special procedures for emergency operations are as follows: <br />(1) Any Person who initiates emergency erations in a public right -of -way shall notify the <br />police department and the fire department before initiating construction <br />(2) On the first working day following the initiation of emergency operations the Person <br />initiating the operations shall perform all actions prescribed by this article and /or by the <br />regulations promulgated pursuant to this article for issuance of a public right -of -way <br />construction permit. <br />(3) Any Person who initiates emergency operations shall contact the Texas One -Call System <br />or any other company operating under the One -Call Statute and to the extent required by <br />
The URL can be used to link to this page
Your browser does not support the video tag.