My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05172011 Regular Meeting
San-Marcos
>
City Clerk
>
01 City Council Minutes
>
2010's
>
2011
>
05172011 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2011 4:52:47 PM
Creation date
6/2/2011 1:53:11 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Minutes
City Clerk - Type
Regular Meeting
Date
5/17/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br />CHANGE ORDER # 3 <br />CITY OF SAN MARCOS, TEXAS <br />PROJECT: Renovations to the Recreation Hall Facility <br />CONSULTANT: Gomillion Kester Zimmerman, Inc. <br />CONTRACTOR: Harris Road Company, Inc. <br />ORIGINAL CONTRACT DATE: 1/4/2011 <br />CHANGE ORDER DATE: 5/4/2011 <br />WORK TO BE ADDED TO OR DELETED FROM SCOPE OF SERVICES <br />The following items are changes to the project design and scope that have been requested <br />by <br />the Owner: <br />• <br />Add concrete deck to river side of building with metal hand rails. Deck size ( 80'w x <br />14'd) <br />$24,485 <br />• <br />Add closet per plans to Rec Hall with two sets of doors and rock on face to match <br />exterior rock. <br />$4,500 <br />• <br />Install electrical conduit, pad and asphalt patch for transformer. <br />$8,122 <br />• <br />Delete crushed granite drive and replace with 3 ' /2 " concrete drive. <br />$2,454 <br />• <br />Remove all overhead doors and replace 6 roll up doors on Lions side. <br />$1,850 <br />• <br />Complete pergolas on north side of building using existing design. <br />$4,000 <br />• <br />Add handrails on second floor to meet code requirements. <br />$3,445 <br />• <br />Electrical Allowance credit <br />($5,300) <br />• <br />Add plumbing and electrical connections for ice maker <br />$1,200 <br />• <br />Extend sewer line <br />$1,800 <br />• <br />Stain Rec Hall floor and outdoor patio next to Rec Hall (color to be selected) <br />$10,000 <br />• <br />Relocate waterline for fire suppression system. <br />$2,300 <br />TOTALS: $58,856.00 <br />Previous contract amount: $1,007,577.50 <br />Net increase /decrease in contract amount: $58,856.00 <br />Revised contract amount: $1,066,433.50 <br />Percentage increase from original contract amount: % ldJ <br />Previous contract time of completion (substantial /final): 150/170 <br />Net increase /decrease in contract time to completion: 0 <br />Revised contract time of completion (substantial /final): 150/170 <br />Requested by: <br />
The URL can be used to link to this page
Your browser does not support the video tag.