Laserfiche WebLink
Committed Projects -Fully Funded <br />Attachment 1 <br />Project Name Existing Funds <br />Water/ Wastewater Projects Total $ 9,735,649 <br />6/1/2011 Attachment 1 2 of 3 <br />Technology Services (IT) funded through General Funds <br />$ <br />1,474,151 <br />IT Computer Projects $ <br />768,037 <br />u <br />17,613,694 <br />Drainage Fund Projects <br />i <br />Disaster Recovery (every 5 yrs) $ <br />266,425 <br />d <br />$ <br />95,353 <br />N <br />streets) <br />tka <br />GIS Server $ <br />15,000 <br />O <br />470,995 <br />M <br />Technology Services Strat $ <br />20,060 <br />C <br />t <br />.L <br />Thorpe Lane Drainage Improvements <br />0) <br />Voice Over Internet Protocol $ <br />404,629 <br />H <br />Water/ Wastewater Projects Total $ 9,735,649 <br />6/1/2011 Attachment 1 2 of 3 <br />Technology Services Total <br />$ <br />1,474,151 <br />General Fund Projects Total <br />$ <br />17,613,694 <br />Drainage Fund Projects <br />Rio Vista Neighborhood Reconstruction - Drainage (joint project in water, ww, <br />$ <br />95,353 <br />streets) <br />ba <br />Storm water Improvements <br />$ <br />470,995 <br />M <br />C <br />.L <br />Thorpe Lane Drainage Improvements <br />$ <br />1,232,727 <br />D <br />Victory Gardens Neighborhood Improvements Phl - Drainage (joint project in <br />$ <br />3,300,924 <br />water, ww, streets) <br />Drainage Projects Total <br />$ <br />5,099,999 <br />Water /Wastewater Fund Projects <br />Comanche 24" Main <br />$ <br />2,753,964 <br />Recreation Hall /Lions Tube Rental Waterline <br />$ <br />81,686 <br />Redwood Waterline <br />$ <br />153,478 <br />u <br />O <br />Rio Vista Neighborhood Improvements - Water (joint project with drainage, <br />$ <br />1,977 <br />CL <br />streets, wastewater) <br />(IJ <br />Water Total <br />$ <br />2,991,105 <br />++ <br />M <br />Bishop /Columbia Wastewater Improvements <br />$ <br />1,094,547 <br />H <br />Old Plant Upstream <br />$ <br />224,433 <br />3 <br />L Rio <br />Vista Neighborhood Improvements - Wastewater (joint project with <br />$ <br />1,977 <br />4) <br />drainage, streets, water) <br />3 <br />Sink Creek Interceptor (Phase II) <br />$ <br />4,763,938 <br />Victory Gardens Subdivision Phase 1 Wastewater (joint project with drainage, <br />$ <br />659,649 <br />streets, water) <br />Wastewater Total <br />$ <br />6,744,544 <br />Water/ Wastewater Projects Total $ 9,735,649 <br />6/1/2011 Attachment 1 2 of 3 <br />