Laserfiche WebLink
2011 -2012 Required Projects <br />Attachment 2 <br />Project Name I Existing Funds Additional Funds <br />Required <br />Northside Development/ Taxiway J Resurface <br />O Routine Airport Maintenance Program (RAMP) <br />IZ Grant Match <br />6. <br />Q Recondition Runway 13 -31 <br />General Fund Projects <br />$ 285,000 $ <br />Airport Total $ 285,000 $ <br />Department Funding $ <br />a Split between General, Drainage, & W /WW Funds <br />V <br />Comments <br />270,060 match for outside funds <br />50,000 match for outside funds <br />50,000 match for outside funds <br />370,060 <br />287,049 <br />a <br />O Technology Services (IT) split between General, Electric, Water /Wastewater Funds <br />v <br />� Application Upgrades $ 133,333 <br />N (Oracle) (every 2 -3 yrs) <br />Network Infrastructure $ 253,333 <br />O <br />C HR Payroll Software $ 217,000 <br />t <br />v <br />Technology Services Total $ <br />CIP Department Total $ <br />- $ <br />287,049 <br />(joint project in water, ww, drainage) <br />900 Mhz Public Safety Radio Conversion <br />$ <br />750,000 <br />Equipment Repair <br />$ <br />64,8101 <br />a Bond <br />Election Project) <br />213,144 <br />: <br />ro <br />Zoll Software Package <br />$ <br />60,000 <br />N <br />R <br />Rattler Way Extension <br />v <br />Fire Department Replace Engine Broadway Station <br />$ <br />627,0001 <br />O <br />a <br />$ <br />(2005 Bond Election Project) <br />UPS Replacement in SMPD Server Room <br />RR Quiet Zones <br />55,000 <br />Public Safety Total $ <br />80,237 $ <br />1,556,810 <br />a <br />O Technology Services (IT) split between General, Electric, Water /Wastewater Funds <br />v <br />� Application Upgrades $ 133,333 <br />N (Oracle) (every 2 -3 yrs) <br />Network Infrastructure $ 253,333 <br />O <br />C HR Payroll Software $ 217,000 <br />t <br />v <br />Technology Services Total $ <br />- <br />Downtown Redevelopment - Streets <br />$ <br />$ 2,675,000 <br />(joint project in water, ww, drainage) <br />$ 9,000,000 TXDOT Funds <br />1,072,072 <br />FM 2439 Hunter Imp <br />= <br />O <br />Loop 82 Railroad Overpass & Post Rd Realign (2005 <br />I $ <br />a Bond <br />Election Project) <br />213,144 <br />: <br />North LBJ - Sessom to Holland - Streets <br />$ <br />CL <br />(joint project with drainage, water, wastewater) <br />I <br />R <br />Rattler Way Extension <br />(joint project with drainage, water, wastewater) <br />River Road and Riverside Bike and Ped <br />$ <br />(2005 Bond Election Project) <br />RR Quiet Zones <br />$ <br />- <br />$ 603,667 <br />9,499 <br />$ 2,675,000 <br />$ 9,000,000 TXDOT Funds <br />1,072,072 <br />$ 1,200,000 TXDOT Funds Additional <br />Funding in 2013 <br />861,517 <br />$ 1,768,471 <br />$ 570,000 <br />213,144 <br />$ 292,856 <br />469,866 <br />$ 113,000 <br />6/1/2011 Attachment 2 1 of 4 <br />