Laserfiche WebLink
a <br />u Technology Services (IT) split between General, Electric, Water /Wastewater Funds <br />•� Application Upgrades (Oracle) (every 2 -3 yrs) $ 133,333 <br />L <br />u7 <br />>. Network Infrastructure $ 253,333 <br />tko <br />O <br />C HR Payroll Software $ 217,000 <br />t <br />W <br />W <br />~ Technology Services Total $ - $ <br />Total Electric requested $ 1,131,710 $ <br />Electric Total From Available Funds $ 1,131,710 $ <br />Total Funds for Electric Projects <br />Total Funds for Required Projects $ 9,078,747 $ <br />Comments <br />603,667 <br />6,234,917 <br />344,000 $5,890,917 in additional <br />funding required <br />$ 1,475,710 <br />28,554,495 I $ 37,633,242 <br />6/1/2011 Attachment 2 4 of 4 <br />2011 -2012 Required Projects <br />Attachment 2 <br />Project Name <br />Existing Funds <br />Additional Funds <br />I I <br />Required <br />Electric Fund Projects <br />Capacitor Procurement Program <br />$ 15,000 <br />$ <br />15,000 <br />Circuit Switcher Change out <br />$ 560,000 <br />$ <br />600,000 <br />Downtown Underground Lines <br />$ 229,261 <br />$ <br />2,359,000 <br />FM 2439 Hunter Electric Imp <br />$ <br />750,000 <br />N <br />Loop 82 Feeder 560 Reconductor <br />$ <br />395,000 <br />O <br />• O <br />a <br />Mitchell Pole Change Out <br />$ <br />74,750 <br />u <br />• a- <br />Ranch Road 12 Feeder RR -30 Upgrade <br />$ 34,486 <br />$ <br />225,000 <br />W <br />Reconductor RR 12 Feeders <br />$ <br />705,000 <br />Redwood Feeder Reconfiguration Projects <br />$ 82,000 <br />$ <br />57,500 <br />Street Light Replacement Program <br />$ 90,629 <br />$ <br />400,000 <br />URD Maintenance <br />$ 120,334 <br />$ <br />50,000 <br />Electric Total <br />$ 1,131,710 <br />$ <br />5,631,250 <br />a <br />u Technology Services (IT) split between General, Electric, Water /Wastewater Funds <br />•� Application Upgrades (Oracle) (every 2 -3 yrs) $ 133,333 <br />L <br />u7 <br />>. Network Infrastructure $ 253,333 <br />tko <br />O <br />C HR Payroll Software $ 217,000 <br />t <br />W <br />W <br />~ Technology Services Total $ - $ <br />Total Electric requested $ 1,131,710 $ <br />Electric Total From Available Funds $ 1,131,710 $ <br />Total Funds for Electric Projects <br />Total Funds for Required Projects $ 9,078,747 $ <br />Comments <br />603,667 <br />6,234,917 <br />344,000 $5,890,917 in additional <br />funding required <br />$ 1,475,710 <br />28,554,495 I $ 37,633,242 <br />6/1/2011 Attachment 2 4 of 4 <br />