My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2011-065
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2011
>
Res 2011-065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2018 9:19:40 AM
Creation date
6/14/2011 2:31:08 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2011-65
Date
6/7/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is an estimate. The final amount of the Local Government's participation will be based on <br />actual costs. <br />Work Responsibilities: <br />1. Engineering Services <br />A. The Local Government shall prepare or cause to be prepared the engineering plans, <br />specifications, and estimates (PS &E) necessary for the development of the Project. <br />The PS &E shall be prepared in accordance with all applicable laws, policies and <br />regulations, deemed necessary by the State. <br />B. The engineering plans shall be developed in accordance with the Texas Department of <br />Transportation Roadway Design Manual, the current edition of the Standard <br />Specifications for Construction and Maintenance of Highways, Streets, and Bridges and <br />the Texas Accessibility Standards. A project development schedule of design activities <br />shall be supplied to the TxDOT South Travis Area Engineer office upon initiation of the <br />Project. Design reviews shall be held for 30 %, 60% and 95% plans in accordance with <br />the Austin District's Project Development Review Process and schedule. <br />C. The Local Government shall submit a copy of the redlined plans provided by the State <br />with all applicable plan submittals to indicate that QC /QA was undertaken. <br />D. The Local Government shall submit the completed PS &E to the State for review and <br />approval five months prior to the Local Government's anticipated bid opening date. <br />AFA —LPAFA VolProj Page 5 of 6 Revised 07/07/10 <br />CSJ # 2293 -01 -022 <br />District # 14 - Austin <br />Code Chart 64 # 37950 <br />Project: FM 2439 - From FM 3407 <br />to Bishon Street <br />Attachment A <br />Payment Provision and Work Responsibilities <br />Description <br />Total <br />Federal <br />Participation <br />State Participation Local Participation <br />Estimated <br />% <br />Cost <br />% <br />Cost % Cost <br />Cost <br />Engineering <br />$0 <br />0% <br />$0 <br />0% <br />$0 0% $0 <br />(by LG) <br />Construction <br />$6,814,078 <br />0% <br />$0 <br />0% <br />$0 100% $6,814,078 <br />(by LG) <br />Subtotal <br />$6,814,078 <br />$0 <br />$0 $6,814,078 <br />Engineering Phase <br />$340,704 <br />0% <br />$0 <br />100% <br />$340,704 0% $0 <br />Direct State Costs 5% <br />Construction Phase <br />$340,704 <br />0% <br />$0 <br />100% <br />$340,704 0% $0 <br />Direct State Costs 5% <br />TOTAL <br />$7,495,486 <br />0% <br />$0 <br />$681,408 0% $6,814,078 <br />This is an estimate. The final amount of the Local Government's participation will be based on <br />actual costs. <br />Work Responsibilities: <br />1. Engineering Services <br />A. The Local Government shall prepare or cause to be prepared the engineering plans, <br />specifications, and estimates (PS &E) necessary for the development of the Project. <br />The PS &E shall be prepared in accordance with all applicable laws, policies and <br />regulations, deemed necessary by the State. <br />B. The engineering plans shall be developed in accordance with the Texas Department of <br />Transportation Roadway Design Manual, the current edition of the Standard <br />Specifications for Construction and Maintenance of Highways, Streets, and Bridges and <br />the Texas Accessibility Standards. A project development schedule of design activities <br />shall be supplied to the TxDOT South Travis Area Engineer office upon initiation of the <br />Project. Design reviews shall be held for 30 %, 60% and 95% plans in accordance with <br />the Austin District's Project Development Review Process and schedule. <br />C. The Local Government shall submit a copy of the redlined plans provided by the State <br />with all applicable plan submittals to indicate that QC /QA was undertaken. <br />D. The Local Government shall submit the completed PS &E to the State for review and <br />approval five months prior to the Local Government's anticipated bid opening date. <br />AFA —LPAFA VolProj Page 5 of 6 Revised 07/07/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.