Laserfiche WebLink
ow <br />ATTACHMENT C <br />AUTHORIZATION OF CHANGE IN SERVICES <br />CITY OF SAN MARCOS, TEXAS <br />PROJECT: Eddie Durham Park Site Development Project <br />CONSULTANT: The Broussard Group, Inc., dba TBG Partners <br />AUTHORIZATION NO.: Three <br />ORIGINAL CONTRACT DATE: April 12, 2010 <br />AUTHORIZATION DATE4 r C—r-c-L 'f a o t l <br />TBG will provide the following services under this Agreement for a new activity at the Eddie Durham Park, located at Martin Luther King Drive, Feltner Alley and Centre Street: <br />1. Provide a final design for the park based on feedback from the City of San Marcos including exclusion of the Cephas House lot; providing parallel parking along MLK and Centre Street in <br />coordination with the new San Marcos Smart Code; walks, two pavilions, furnishing, fencing and landscaping. <br />2. Perform deed research, conduct land boundary survey, prepare subdivision plat for the park site east of Feltner Alley, submit to the City for review and comment, address comments and <br />assist City in plat recordation. <br />3. Provide additional land topographic survey for the design of parking spaces and sidewalk along Centre Street. <br />4. Provide additional construction document services to include full build out of the park including all parking, hardscape, structures, lighting, furnishings, planting and irrigation. Structural <br />engineering and electrical engineering services are included for site screen walls at the band shelter and site lighting. <br />5. Submit permit drawings and/or construction documents to a Registered Accessibility Specialist for compliance review with TAS (Texas Accessibility Standards). <br />6. Assist the City of San Marcos during the bidding and negotiation phase of work including assistance in the review of bid tabulations and make recommendations regarding qualified <br />contractors. Respond to questions during the bidding and contract negotiations and provide information and clarifications if needed. It is assumed that the City of San Marcos will publicly <br />advertise, bid the project and manage this process. <br />7. Provide additional construction observation services for the full scope of hardscape work and new parking. Visit the site during construction, be present for meetings, review submittals and <br />qualify the construction installation. <br />8. Reimbursa TAS review fee. inso P.rtinn fee and reaistration fee. In -house reproducibles, mileage and deliveries. Excludes project manual reproduction for bidding and construction. <br />9. See Exhibit 'i Tor Tee DreaKoown. <br />Previous contract amount: <br />Net increase /decrease in contract amount: <br />Revised contract amount: <br />The Broussard Group, Inc., dba <br />By: <br />Brian,Ott, Princip <br />Printed name, title <br />Approved by: <br />City of San Marcos: <br />TBG Partners <br />By: <br />CL <br />rv"N ,YW6 1 \� <br />$ 40.800 <br />$ 38,250 <br />$ 79,050 <br />Date: 05.04.2011 <br />8 <br />Account Number: 250 - 335- 56189 <br />i /ir(t <br />Date: (P //,`3 <br />CITY HALL . 630 EAST HOPKINS • SAN MARCOS, TEXAS 78666 . 512.393.8150 a FACSIMILE 512.393.3983 <br />SANMARCOSTX.GOV <br />