Laserfiche WebLink
<br />8/01 <br /> <br />Program; assist and coordinate with CAPCO on all phases of the 9-1-1 Map/AU project <br />to include Pilot, Build, Maintenance and add-on Phases <br />· practice preventive maintenance for the GIS equipment including, at a minimum, <br />backing up data biweekly on removable medium, if the equipment requires it, and storing <br />the removable medium in a secure place <br /> <br />LIST OF EXHIBITS <br /> <br />The following Exhibits are part of the 9-1-1 Policies and Procedures A1anual: <br /> <br />1. Line Item Transfer Request <br />2. Addressing Maintenance Project Financial Report <br />3. Requisition Form <br />4. Trouble Reporting Procedures <br />5. Trouble Log <br />6. Test Report <br />7. TDD/TTY Use Log <br />8. Emergency Communications Training Cancellation Policy <br />9. County 9-1-1 Coordinator Monthly Report/Database Performance <br />Measure <br />10. 9-1-1 Public Education Materials Order Form <br />11. Event Profile <br />12. MSAG Change Request Form <br />13. ANI/AU Problem Call Report <br /> <br />9 <br />