Laserfiche WebLink
Water Continued <br />Old Bastrop Hwy Water Phase 1 <br />Post Road Oversize 16" [0 24" <br />Quad Run Water Line Phase II <br />Rattler Road Extension - Water(jomt project with <br />$ 100,000 <br />drainage, streets, wastewater) <br />Red Sky Replacement <br />Redwood Waterline <br />Research Center - Texas State <br />$ 250,000 <br />$ 150,000 <br />Rio Vista Neighborhood Improvements -Water (joint <br />project with drainage, streets, wastewater) <br />River Ridge Water Pre[ Engr Rprt <br />RR 12 Main for Edwards Aquifer Customers <br />S 520,000 <br />5 Bishop Drainage Improvements - Water (joint <br />$ 160,000 <br />Delayed Proelct <br />project with drainage, streets, wastewater) <br />Southridge Estates Water <br />Soyars Storage Tank <br />Stagecoach to McCarty Water Line <br />Staples Road Phase 1 12" Water <br />Sunset Acres Neighborhood Improvements - Water <br />(joint Project with drainage, streets, wastewater) <br />Surface Water Trtnmt Plant Auto Transfer Switch <br />Trunk Hill Tank <br />Victory Gardens Neighborhood Improvements Ph I - <br />$ 401,560 <br />Water (joint project with drainage, streets, <br />Victory Gardens Neighborhood Improvements Ph [I - <br />Water (jmnt project with drainage, streets, <br />W Distribution Imp <br />$ 100,000 <br />$ 70,000 <br />Wallace Addition Neighborhood Improvements - <br />_Water joint project with drainage,. streets, <br />_ <br />Water Improvements <br />$ 70,000 <br />Water Main Oversizing <br />$ 275,000 <br />Water Master Plan <br />Water Pump Station Improvements <br />$ 100,000 <br />Water Supply (HPCUA CIP) 2 <br />$ 2,259,539 <br />Year not Assigned <br />Water Total <br />$ 3,589,539 <br />S 3,687,437 <br />