Laserfiche WebLink
Sessom Reconstruction PH 2 $ 720,000 Fully Funded with CAMPO funds in 2014 <br />Sessom Reconstruction PH 1 $ 207,000 Project Complete <br />SH 21 San Marcos River Bridge Prel Engr Rpt <br />Sidewalk Repair <br />Sidewalks- Neighborhoods (Bishop, etc.) <br />Sidewalks Along Chestnut St <br />S Bishop Drainage Improvements - Streets (joint <br />project with drainage, water, wastewater) <br />Street Minor Construction <br />Sunset Acres Neighborhood Improvements - Streets <br />(jomtproject with dramage, water, wastewater) <br />Thorpe Hopkins Imp <br />Thorpe Ln Overlay /Bike Lane Improve <br />Traffic Calming (speed humps, signage, school zones) <br />Traffic Signal Sync Update <br />Traffic Signal Sync /Reliability Project <br />Transportation Imp $ 100,000 <br />Transportation Master Plan <br />Victory Gardens Ph I - Streets (joint project with <br />drainage, water, wastewater) <br />Victory Gardens Neighborhood Improvements Ph II - <br />Streets (joint project with drainage, water, <br />Wallace Addition Neighborhood Improvements - <br />Streets (joint project with drainage, water, <br />Westover Drainage Improvements - Streets (joint <br />project with drainage) <br />Yarr ngton Improvements <br />Transpetation Total $ 927,000 $ 15,719,327 <br />